DEPARTMENT OF THE ENVIRONMENT
Environment Protection and Biodiversity Conservation Act 1999
For further information see the referrals list at http://www.environment.gov.au/epbc/notices
and type the reference number in the Search box
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2013/7039 | DBP Development Group Nominees Pty Ltd/Commercial development/Onslow/WA/Construct 110km buried natural gas pipeline from Onslow, connecting to Dampier/Bunbury natural gas pipeline | 06/12/2013 |
2013/6856 | Crocodile Gold Corp./Mining/adjacent to Stawell NE of the township in western Victoria/VIC/The Big Hill enhanced open cut mining development, adjacent Stawell, Victoria | 09/12/2013 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2009/5007 | Arrow CSG (Australia) Pty Ltd/Energy generation and supply (non-renewable)/Curtis Island, Approx. 6km N of Gladstone, QLD/QLD/The Arrow LNG Facility, Curtis Island, Gladstone | Approved with conditions | 10/12/2013 |
2009/5008 | Arrow CSG (Australia) Pty Ltd/Mining/Gladstone City Gate to Curtis Island/QLD/The Arrow Gas Transmission Pipeline, Gladstone to Curtis Island | Approved with conditions | 10/12/2013 |
2011/6194 | Adani Abbot Point Terminal Pty Ltd /Mining/Port of Abbot Point/QLD/Abbot Point Coal Terminal 0 | Approved with conditions | 10/12/2013 |
2011/6213 | North Queensland Bulk Ports Corporation Limited/Exploration (mineral, oil and gas - marine)/Approx 3km offshore Abbot Point/QLD/Abbot Point Terminal 0, 2 & 3 Capital Dredging | Approved with conditions | 10/12/2013 |
variation of conditions of approval (EPBC Act s.143)
Title | Date | |
2009/4974 | Australia Pacific LNG Pty Limited/Energy generation and supply (non-renewable)/Walloon Gas Fields, Surat Basin, Darling Downs/QLD/Expansion of Coal Seam Gas Fields | 05/12/2013 |
2010/5549 | Land Development Agency/Residential development/Lawson South north-east of Belconnen town centre/ACT/ Lawson South residential development | 11/12/2013 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2010/5344 | Arrow Energy/Energy generation and supply (non-renewable)/200km West of Brisbane /QLD/Expansion Of Coal Seam Gas Operations | 12/01/2014 | 12/12/2013 |
lapsed proposals (EPBC Act s.155)
Reference | Title | Date |
2005/2156 | Caversham Property Developments Pty Ltd/Urban and commercial redevelopment/Adelaide/SA/Redevelopment of Adelaide GPO | 05/12/2013 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment or may not meet timeframes for notification. The Department of the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.