DEPARTMENT OF THE ENVIRONMENT AND ENERGY
Environment Protection and Biodiversity Conservation Act 1999
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2018/8297 | APA TRANSMISSION PTY LIMITED / Energy Generation and Supply (non-renewable) / Crib Point to Pakenham / Victoria / Crib Point to Pakenham Gas Pipeline, Vic |
| 28/11/2018 |
2018/8298 | AGL WHOLESALE GAS LIMITED / Energy Generation and Supply (non-renewable) / 89C\PP2159, 89D\PP2159, 2040\PP2159 / Victoria / Gas Import Facility, Crib Point, Vic |
| 28/11/2018 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2018/8279 | MAIN ROADS / Transport - Land / Mead Road, Albany, WA, 6330 / Western Australia / Sth Coast Hwy Road Widening, Albany, WA | 30/10/2018 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2017/8099 | ALBEMARLE LITHIUM PTY LTD / Manufacturing / Part of Lot 510, Wellesley Road, Wellesley / Western Australia / Albemarle Lithium hydroxide manufacturing plant, Kemerton, WA | Approved with conditions | 26/11/2018 |
2012/6538 | Far North Queensland Ports Corporation Limited (t / a Ports North) / Transport - Land / Trinity Inlet, Cairns / Queensland / Cairns Shipping Development (Trinity Inlet) Project, QLD | Approved with conditions | 28/11/2018 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment and Energy or may not meet timeframes for notification. The Department of the Environment and Energy has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment and Energy regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.