DEPARTMENT OF THE ENVIRONMENT AND ENERGY
Environment Protection and Biodiversity Conservation Act 1999
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2018/8330 | ROY HILL IRON ORE PTY LTD / Mining / M46 / 518, M46 / 519, L46 / 104, L46 / 110, L46 / 129, L46 / 141, L46 / 142, L47 / 346, L47 / 347, L47 / 642, L47 / 735 / Western Australia / Roy Hill Iron Ore Mine expansion, Pilbara Region, WA |
| 17/05/2019 |
2018/8376 | PACIFIC INTERNATIONAL DEVELOPMENT CORPORATION PTY LTD/Residential Development/Lot 24 on SP142997 & Lot 1 on RP49296/Queensland/Bushman Drive Residential Development, Jimboomba, Qld |
| 17/05/2019 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2019/8399 | WESTERN AUSTRALIAN LAND AUTHORITY / Commercial Development / Lots 100-101 Sayer Rd, Hope Valley, WA / Western Australia / Development of Lots 100-101 Sayer Road, Hope Valley, WA | 21/05/2019 |
2019/8405 | SCCL AUSTRALIA LIMITED / Telecommunications / 1332 / DP752011 / Commonwealth Marine / Australia-USA Southern Cross NEXT fibre optic cable installation | 21/05/2019 |
2019/8396 | PNX METALS LIMITED / Mining / Parcel numbers: NT Por 1344 and NT Por 7122 / Northern Territory / Hayes Creek Mining Project, 50km north of Adelaide River, NT | 22/05/2019 |
2018/8353 | DDG OPERATIONS PTY LTD / Energy Generation and Supply (non-renewable) / Lease I123605 and Lease I123606. DBNGP Corridor. / Western Australia / Pluto-North West Shelf Interconnector, Burrup Peninsula, WA | 24/05/2019 |
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2018/8376 | PACIFIC INTERNATIONAL DEVELOPMENT CORPORATION PTY LTD / Residential Development / Lot 24 on SP142997 & Lot 1 on RP49296 / Queensland / Bushman Drive Residential Development, Jimboomba, Qld | Preliminary Documentation | 17/05/2019 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment and Energy or may not meet timeframes for notification. The Department of the Environment and Energy has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment and Energy regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.