DEPARTMENT OF THE ENVIRONMENT AND ENERGY
Environment Protection and Biodiversity Conservation Act 1999
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2019/8507* | AUSTRALIAN RAIL TRACK CORPORATION LIMITED / Transport - Land / Multiple parcels of land, Muswellbrook / New South Wales / N40-Ulan line underbridge replacement, Muswellbrook, NSW | 6/09/2019 |
* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from http://epbcnotices.environment.gov.au/referralslist/
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2019/8498 | PERTH AIRPORT PTY LTD / Transport - Air and Space / Perth Airport / Western Australia / Airport Central exposure draft MDP, Perth Airport, WA | Accredited Assessment Process under the Airports Act 1996 (Cth) | 2/09/2019 |
variation of conditions of approval (EPBC Act s.143)
Title | Date | |
2015/7454 | MAIN ROADS WA / Transport - Land / Between Ballidu and Pithara / Western Australia / Northam Pithara Road widening and sealing (SLK 129.12-152.25), WA | 4/09/2019 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment and Energy or may not meet timeframes for notification. The Department of the Environment and Energy has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment and Energy regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.