DEPARTMENT OF AGRICULTURE, WATER AND THE ENVIRONMENT
Environment Protection and Biodiversity Conservation Act 1999
EPBC Act Part 7-9 decisions published, 7/03/2022 to 13/03/2022
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2021/9137 | NEOEN AUSTRALIA PTY. LTD. / Energy Generation and Supply (renewable) / Glengowan Road, Ulogie / Queensland / Mount Hopeful Wind Farm |
| 7/03/2022 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2021/9126* | Hunter Developments PTY LTD / Commercial Development / Rosny Hill Recreation Area, 12A Akuna St, Rosny / Tasmania / Rosny Hill Lookout and Hotel | 11/03/2022 |
* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from http://epbcnotices.environment.gov.au/referralslist/
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2021/9137 | NEOEN AUSTRALIA PTY. LTD. / Energy Generation and Supply (renewable) / Glengowan Road, Ulogie / Queensland / Mount Hopeful Wind Farm | Preliminary Documentation | 7/03/2022 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2018/8340 | KARREMAN QUARRIES PTY LTD / Mining / Existing Operation - Lot 100 on SP234173, Existing and proposed: Lots 1-5 on RP186598 / Queensland / West Mt Cotton Quarry Expansion, Redland City, Qld | Approved with conditions | 3/03/2022 |
2020/8755 | CleanCo Queensland Limited / Energy Generation and Supply (renewable) / located approximately 40 km south-west of the township of Warwick / Queensland / Karara Wind Farm Project, QLD | Approved with conditions | 7/03/2022 |
2020/8748 | Bolinda Place Pty Ltd ATF Bolinda Place Unit Trust / Commercial Development / 75-135 Bolinda Rd, Campbellfield / Victoria / Bolinda Road development, Campbellfield, Victoria | Approved with conditions | 8/03/2022 |
2020/8676 | Vitrinite Pty Ltd / Mining / near Moranbah / Queensland / Vulcan Complex Project | Approved with conditions | 9/03/2022 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2021/8965 | CAPITAL PLUS 1 WOODBURY RIDGE PTY LTD / Residential Development / adjacent to Sutton Road and Federal Highway, Sutton / New South Wales / Woodbury Ridge Estate, Sutton | 3/06/2022 | 7/03/2022 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Agriculture, Water and the Environment or may not meet timeframes for notification. The Department of Agriculture, Water and the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Agriculture, Water and the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.