COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE WA-4-PL

(COSSACK-WANAEA PIPELINE)

 

I, JOANNE JENNIFER BELL, Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby vary Pipeline Licence WA-4-PL, granted on 17 March 1995 (the Licence), for which:

 

Woodside Energy Ltd.

(ACN 005 482 986)

 

BHP Petroleum (North West Shelf) Pty Ltd

(ACN 004 514 489)

 

BP Developments Australia Pty. Ltd.

(ACN 081 102 856)

 

Chevron Australia Pty Ltd

(ACN 086 197 757)

 

Japan Australia LNG (MIMI) Pty. Ltd.

(ACN 006 303 180)

 

Shell Australia Pty Ltd

(ACN 009 663 576)

 

are the registered titleholders, as set out below.

 

The variation takes effect on the day on which this notice of variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

 

JOANNE JENNIFER BELL

OPERATIONS MANAGER

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 

VARIATION OF

PIPELINE LICENCE WA-4-PL

 

Cossack-Wanaea Pipeline

 

Route of Pipeline

 

1. In the ‘First Schedule’, the ‘Route of The Pipeline’ description is varied by:

a) deleting existing text under this heading,

b) and replacing it with:

“The route of the pipeline is described in the table hereunder commencing at the Wanaea field Riser Turret Mooring (RTM) to the SSIV tie-in point on 1TL and the tie-in connection on the Goodwyn A (GWA) to NRA interfield pipeline, along a line no point of which shall be more than 125 metres from the pipeline route shown in the drawing at Attachment 1. Coordinates are based on Geodetic Datum of Australia (GDA94), UTM Zone 50.”

Cossack-Wanaea Pipeline

Feature Name

KP

Eastings (m)

Northings (m)

Wanaea Riser Turret Mooring

N/A

441988.0016

7833895.957

Riser Base

N/A

441869.274

7833902.796

Flexible Crossing with Decommissioned Flowline

N/A

441540.8041

7833923.773

Flexible Crossing with Oil Flowline

N/A

441544.7576

7833911.563

Pipeline End Manifold

0

441553.7904

7833887.58

MEG Line Crossing

0.664

440908.2444

7833662.349

Oil Flowline Crossing

0.746

440830.2624

7833635.35

Decommissioned Flowline Crossing

0.771

440807.0975

7833627.368

Power Cable Crossing

32.078

409997.2777

7834180.546

Angel Pipeline Crossing

32.167

409907.430

7834180.547

Pipeline End Manifold

32.333

409741.9592

7834179.26

Valve Skid WCGEL to NRA

N/A

409721.0568

7834167.365

Tie-in to GWA to NRA interfield pipeline

N/A

409580.1903

7834207.5

1TL SSIV Tie-in

N/A

409712.8447

7834142.589

 

c) The WA-4-PL Petroleum Pipeline Route Map at Annexure A is deleted and replaced with the map at Attachment 1.

Specifications

2. In the ‘Second Schedule’, ‘1. Specifications’ is varied by deleting all existing text and replacing it with:

(A) System Description

The Pipeline is comprised of the following main components:

 

 

 

 

 

(B) Design

(i) Except as otherwise specified in this Schedule the pipeline shall be designed, constructed, tested and operated in accordance with the Australian Standard 2885: SAA Gas and Liquid Petroleum Pipelines. The pipeline is currently operated in accordance with the DNV-ST-F101 Submarine Pipeline Systems Standard.

 

(ii) The pipeline design is based on the following parameters:-

(a) Outside diameter of pipe (mm)  323.9

Nominal wall thickness (mm)  12.7

Length of pipeline (km)   32.3

(b) Pipe steel grade    API 5L X52

(c) Pipe specification    Electric Resistance Welded

(d) Joint type     Butt welded

(e) Minimum yield strength (MPa)  358

(f) Design pressure (MPag)   14.8

(g) Maximum operating pressure (MPag) 14.8

(h) Field test pressure (MPa)   18.5

(i) Fittings and valves specification  ANSI Class 900

(j) Water depth range (m)   78 – 120

(k) Corrosion coating:  External 6 mm asphalt enamel

Internal 0.060 mm epoxy

Field joints Cold bituminous tape and HD polyurethane infill

(l) Weight coating    30 mm thick reinforced concrete, SG 3.04

(m) Cathodic Protection   Sacrificial Zinc Anodes

(n) Maximum inlet temperature (⁰C)  65

(o) Minimum operating temperature (⁰C) a) Between the flexible riser and flowline (from Okha Floating Production, Storage and Offloading [FPSO] Facility Riser Base Assembly [RBA] to the Wanaea Pipeline End [WANPE]): -30°C integrity limit;

b) Between the rigid pipeline, in-line structures and rigid spool (North Rankin A Pipeline End [NRAPE] to 1TL): 0°C integrity limit; and

c) Between the flexible jumpers (from the NRAPE to the Goodwyn Alpha Inter Field Pipeline [GWAIFLTI]): normal operating limit is 18.95°C with an integrity limit of -3.5°C which may occur during a Subsea Isolation Valve (SSIV) leak-off testing.             

(p) Substance to be conveyed Dehydrated dry natural gas in compressed phase

(q) Pipeline specific gravity (min) 1.68

(r) Design Capacity (Std m3/day)  3.11 x 106 at 15.6⁰C, 1 atm

(s) Design environmental loading  100-year storm conditions

 

(C) Pressure Test

Before seeking the consent of the Designated Authority to operate the pipeline, the pipeline shall be subjected to pressure tests in compliance with Section 9 of Australian Standard 2885, SAA Pipeline Code in accordance with the requirements of Australian Standard 1978, SAA Code for Field Pressure Testing of Pipelines. During the test, the pressure at the control points shall be measured at appropriate intervals using pressure gauges calibrated and certified by dead weight tester of adequate sensitivity for the volume of the test section and all details should be recorded. Temperatures representative of the sea water adjacent to the pipeline shall also be measured at appropriate time intervals using instruments of adequate sensitivity for the volume of the test section and all details shall be recorded.

In addition, suitable continuous recording equipment shall be used to record the pressure and temperature in the pipeline during the whole period of pressure testing. The pressure recording equipment and any other pressure gauges used in the pipeline pressure test shall be checked immediately prior to and after the test by an adequately sensitive dead weight tester. Where a pressure/volume plot is applicable, water volume shall be measured by suitably calibrated devices.

The pipeline shall not be operated until an adequate examination has been carried out, after final tie-in, to determine that the pipeline is free from buckles, dents or any other damage.

The licensee shall give the Director at least three days notice of intention to test and shall within thirty days of completion of the pressure test, forward to the Director a copy of the pressure chart including its calibration and graphs of the dead weight tester readings (as well as other pertinent factors) all duly interpreted and witnessed in a certified test report.

The licensee shall provide transport and accommodation at its expense for Inspectors nominated by the Director to witness any testing.

(D) Welding Procedures and Welders’ Qualification Tests

Before commencing the construction of the pipeline, the welding procedure and welder’s qualification tests, in compliance with the Australian Standard 2885, SAA Pipeline Code, shall be submitted to the Director for approval before commencing the construction of the pipeline. The licensee shall forward to the Director a copy of the test results (as well as other pertinent factors) all duly interpreted in a certified test report.

(E) Coating System tests

Before commencing the construction of the pipeline, the adequacy of the proposed protective coating system shall be as far as reasonably practicable. The licensee shall forward to the Director a copy of any test results (as well as other pertinent factors).”

Note: text in italics in Specifications reflects changes to the licence given effect by this variation.

Attachment 1

Map depicting route of Pipeline Licence WA-4-PL.