Airports (Building Control) Amendment Regulations 2002 (No. 1)1

Statutory Rules 2002 No. 1902

I, PETER JOHN HOLLINGWORTH, Governor-General of the Commonwealth of Australia, acting with the advice of the Federal Executive Council, make the following Regulations under the Airports Act 1996.

Dated 8 August 2002

PETER HOLLINGWORTH

Governor-General

By His Excellency’s Command

JOHN ANDERSON

Minister for Transport and Regional Services

1 Name of Regulations

  These Regulations are the Airports (Building Control) Amendment Regulations 2002 (No. 1).

2 Commencement

  These Regulations commence on gazettal.

3 Amendment of Airports (Building Control) Regulations 1996

  Schedule 1 amends the Airports (Building Control) Regulations 1996.

Schedule 1 Amendments

(regulation 3)

 

[1] Subparagraph 2.02 (1) (b) (ii)

substitute

 (ii) in any other case — the amount, according to the total estimated cost of the proposed building or works, set out in Schedule 1 for the airport site.

[2] Subregulation 2.02 (2)

omit the table

[3] Paragraph 2.10 (3) (a)

substitute

 (a) $250; and

[4] Paragraph 2.10 (4) (b)

omit

$200.

insert

$250.

[5] Paragraph 2.16 (2A) (a)

substitute

 (a) $250; and

[6] After Part 6

insert

Schedule 1 Fees payable for building applications

(regulation 2.02)

Part 1 Adelaide and Parafield Airports

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

250

2

25 001 to 50 000

250

3

50 001 to 100 000

250

4

100 001 to 200 000

400

5

200 001 to 300 000

600

6

300 001 to 400 000

800

7

400 001 to 500 000

1 000

8

500 001 to 1 000 000

2 000

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

6 000

11

3 000 001 to 4 000 000

8 000

12

4 000 001 to 5 000 000

10 000

13

5 000 001 to 10 000 000

20 000

14

10 000 001 to 20 000 000

40 000

15

20 000 001 to 30 000 000

60 000

16

30 000 001 to 40 000 000

70 000

17

40 000 001 to 50 000 000

70 000

18

50 000 001 or more

70 000

Part 2 Alice Springs Airport

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

250

2

25 001 to 50 000

400

3

50 001 to 100 000

600

4

100 001 to 200 000

900

5

200 001 to 300 000

1 200

6

300 001 to 400 000

1 500

7

400 001 to 500 000

1 800

8

500 001 to 1 000 000

2 800

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

5 000

11

3 000 001 to 4 000 000

6 000

12

4 000 001 to 5 000 000

7 000

13

5 000 001 to 10 000 000

10 000

14

10 000 001 to 20 000 000

20 000

15

20 000 001 to 30 000 000

30 000

16

30 000 001 to 40 000 000

40 000

17

40 000 001 to 50 000 000

50 000

18

50 000 001 or more

70 000

Part 3 Brisbane, Archerfield and Coolangatta Airports

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

400

2

25 001 to 50 000

600

3

50 001 to 100 000

800

4

100 001 to 200 000

1 200

5

200 001 to 300 000

1 500

6

300 001 to 400 000

1 800

7

400 001 to 500 000

2 100

8

500 001 to 1 000 000

2 800

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

5 000

11

3 000 001 to 4 000 000

6 000

12

4 000 001 to 5 000 000

7 000

13

5 000 001 to 10 000 000

10 000

14

10 000 001 to 20 000 000

20 000

15

20 000 001 to 30 000 000

30 000

16

30 000 001 to 40 000 000

40 000

17

40 000 001 to 50 000 000

50 000

18

50 000 001 or more

70 000

Part 4 Canberra Airport

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

150

2

25 001 to 50 000

200

3

50 001 to 100 000

300

4

100 001 to 200 000

425

5

200 001 to 300 000

550

6

300 001 to 400 000

675

7

400 001 to 500 000

800

8

500 001 to 1 000 000

1 300

9

1 000 001 to 2 000 000

2 050

10

2 000 001 to 3 000 000

2 800

11

3 000 001 to 4 000 000

3 550

12

4 000 001 to 5 000 000

4 300

13

5 000 001 to 10 000 000

8 050

14

10 000 001 to 20 000 000

13 100

15

20 000 001 to 30 000 000

18 100

16

30 000 001 to 40 000 000

23 100

17

40 000 001 to 50 000 000

28 100

18

50 000 001 or more

33 100

Part 5 Darwin Airport

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

250

2

25 001 to 50 000

400

3

50 001 to 100 000

600

4

100 001 to 200 000

900

5

200 001 to 300 000

1 200

6

300 001 to 400 000

1 500

7

400 001 to 500 000

1 800

8

500 001 to 1 000 000

2 800

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

5 000

11

3 000 001 to 4 000 000

6 000

12

4 000 001 to 5 000 000

7 000

13

5 000 001 to 10 000 000

10 000

14

10 000 001 to 20 000 000

20 000

15

20 000 001 to 30 000 000

30 000

16

30 000 001 to 40 000 000

40 000

17

40 000 001 to 50 000 000

50 000

18

50 000 001 or more

70 000

Part 6 Hobart Airport

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

560

2

25 001 to 50 000

625

3

50 001 to 100 000

750

4

100 001 to 200 000

1 300

5

200 001 to 300 000

1 600

6

300 001 to 400 000

1 900

7

400 001 to 500 000

2 200

8

500 001 to 1 000 000

4 000

9

1 000 001 to 2 000 000

6 000

10

2 000 001 to 3 000 000

8 000

11

3 000 001 to 4 000 000

10 000

12

4 000 001 to 5 000 000

12 000

13

5 000 001 to 10 000 000

22 000

14

10 000 001 to 20 000 000

42 000

15

20 000 001 to 30 000 000

62 000

16

30 000 001 to 40 000 000

82 000

17

40 000 001 to 50 000 000

102 000

18

50 000 001 or more

143 000

Part 7 Launceston Airport

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

560

2

25 001 to 50 000

625

3

50 001 to 100 000

750

4

100 001 to 200 000

1 000

5

200 001 to 300 000

1 375

6

300 001 to 400 000

1 625

7

400 001 to 500 000

1 875

8

500 001 to 1 000 000

3 125

9

1 000 001 to 2 000 000

6 525

10

2 000 001 to 3 000 000

8 125

11

3 000 001 to 4 000 000

10 625

12

4 000 001 to 5 000 000

13 125

13

5 000 001 to 10 000 000

25 625

14

10 000 001 to 20 000 000

50 625

15

20 000 001 to 30 000 000

75 625

16

30 000 001 to 40 000 000

100 625

17

40 000 001 to 50 000 000

125 625

18

50 000 001 or more

176 000

Part 8 Melbourne (Tullamarine), Essendon and Moorabbin Airports

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

400

2

25 001 to 50 000

600

3

50 001 to 100 000

800

4

100 001 to 200 000

1 200

5

200 001 to 300 000

1 500

6

300 001 to 400 000

1 800

7

400 001 to 500 000

2 100

8

500 001 to 1 000 000

2 800

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

5 000

11

3 000 001 to 4 000 000

6 000

12

4 000 001 to 5 000 000

7 000

13

5 000 001 to 10 000 000

10 000

14

10 000 001 to 20 000 000

20 000

15

20 000 001 to 30 000 000

30 000

16

30 000 001 to 40 000 000

40 000

17

40 000 001 to 50 000 000

50 000

18

50 000 001 or more

70 000

Part 9 Perth and Jandakot Airports

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

250

2

25 001 to 50 000

400

3

50 001 to 100 000

600

4

100 001 to 200 000

900

5

200 001 to 300 000

1 200

6

300 001 to 400 000

1 500

7

400 001 to 500 000

1 800

8

500 001 to 1 000 000

2 800

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

5 000

11

3 000 001 to 4 000 000

6 000

12

4 000 001 to 5 000 000

7 000

13

5 000 001 to 10 000 000

10 000

14

10 000 001 to 20 000 000

20 000

15

20 000 001 to 30 000 000

30 000

16

30 000 001 to 40 000 000

40 000

17

40 000 001 to 50 000 000

50 000

18

50 000 001 or more

70 000

Part 10 Sydney (Kingsford Smith), Camden, Hoxton Park and Bankstown Airports

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

400

2

25 001 to 50 000

600

3

50 001 to 100 000

800

4

100 001 to 200 000

1 200

5

200 001 to 300 000

1 500

6

300 001 to 400 000

1 800

7

400 001 to 500 000

2 100

8

500 001 to 1 000 000

2 800

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

5 000

11

3 000 001 to 4 000 000

6 000

12

4 000 001 to 5 000 000

7 000

13

5 000 001 to 10 000 000

10 000

14

10 000 001 to 20 000 000

20 000

15

20 000 001 to 30 000 000

30 000

16

30 000 001 to 40 000 000

40 000

17

40 000 001 to 50 000 000

50 000

18

50 000 001 or more

70 000

Part 11 Townsville Airport

 

Item

Total estimated cost of proposed building
or works ($)

Application fee ($)

1

Up to 25 000

400

2

25 001 to 50 000

600

3

50 001 to 100 000

800

4

100 001 to 200 000

1 200

5

200 001 to 300 000

1 500

6

300 001 to 400 000

1 800

7

400 001 to 500 000

2 100

8

500 001 to 1 000 000

2 800

9

1 000 001 to 2 000 000

4 000

10

2 000 001 to 3 000 000

5 000

11

3 000 001 to 4 000 000

6 000

12

4 000 001 to 5 000 000

7 000

13

5 000 001 to 10 000 000

10 000

14

10 000 001 to 20 000 000

20 000

15

20 000 001 to 30 000 000

30 000

16

30 000 001 to 40 000 000

40 000

17

40 000 001 to 50 000 000

50 000

18

50 000 001 or more

70 000

Notes

1. These Regulations amend Statutory Rules 1996 No. 292, as amended by 1997 Nos. 114 and 200; 1999 No. 52.

2. Notified in the Commonwealth of Australia Gazette on
1 September 2002.