National Measurement Amendment Regulations 2004 (No. 1)1
I, PHILIP MICHAEL JEFFERY, Governor-General of the Commonwealth of Australia, acting with the advice of the Federal Executive Council, make the following Regulations under the National Measurement Act 1960.
Dated 10 June 2004
P. M. JEFFERY
Governor-General
By His Excellency’s Command
WARREN ENTSCH
Parliamentary Secretary to the Minister for Industry, Tourism and Resources
Contents
1 Name of Regulations
2 Commencement
3 Amendment of National Measurement Regulations 1999
Schedule 1 Amendments commencing on 1 July 2004
Schedule 2 Amendments commencing on 1 July 2005
These Regulations are the National Measurement Amendment Regulations 2004 (No. 1).
These Regulations commence as follows:
(a) on 1 July 2004 — regulations 1 to 3 and Schedule 1;
(b) on 1 July 2005 — Schedule 2.
3 Amendment of National Measurement Regulations 1999
Schedules 1 and 2 amend the National Measurement Regulations 1999.
Schedule 1 Amendments commencing on 1 July 2004
(regulation 3)
[1] Regulation 3, definition of permissible variation
substitute
maximum permissible uncertainty, for a standard of measurement, means the maximum uncertainty permitted in the verification of the standard under these Regulations.
maximum permissible variation, for a standard of measurement, means the maximum amount by which the standard may differ from the denomination indicated by the standard in these Regulations.
[2] Regulation 3, definition of standard reference conditions
omit
[3] Regulation 3, definition of verifying authority, paragraph (b)
omit
[4] Regulation 5, note
substitute
Note The Chief Metrologist may issue written guidelines governing the way in which Australian legal units of measurement may be combined to produce an Australian legal unit of measurement — see Act, paragraph 7B (1) (a).
[5] Regulation 7, note
substitute
Note The Chief Metrologist may issue written guidelines governing the way in which Australian legal units of measurement or a combination of Australian legal units of measurement may be combined with these prefixes to produce Australian legal units of measurement — see Act, paragraph 7B (1) (b).
[6] Subregulation 16 (3)
omit
13 (3)
insert
13 (4)
[7] Paragraph 18 (2) (e)
omit
range of
[8] Subregulation 18 (3)
omit
[9] Paragraph 19 (1) (f)
omit
range of
[10] Subregulations 20 (1) and (2)
substitute
(1) The Chief Metrologist must send a copy of a determination made under subregulation 17 (2), 18 (4) or 19 (2) to each verifying authority appointed to verify standards of measurement to which the determination relates.
[11] Subregulation 20 (3)
omit
subregulation (1) or (2).
insert
subregulation (1).
[12] Regulation 21
substitute
21 Recognition of foreign reference standards of measurement
(1) The Chief Metrologist may issue a written notice recognising a reference standard of measurement that is verified (however described) in a foreign country as a reference standard of measurement if:
(a) the verified values of the standard of measurement are established by means of, by reference to, by comparison with or by derivation from the primary standards of measurement of the foreign country; and
(b) appropriate comparability is established between:
(i) the relevant primary standards of measurement of the foreign country; and
(ii) one or more Australian primary standards of measurement.
(2) A recognised reference standard of measurement is taken to be a verified reference standard of measurement.
(3) A written notice issued under subregulation (1) in relation to a reference standard of measurement is taken to be a certificate issued under regulation 19 for the reference standard of measurement.
[13] Regulation 24
omit
[14] Regulation 25, heading
substitute
25 Accuracy of State secondary standards of measurement — maximum permissible uncertainty
[15] Regulation 26, heading
substitute
26 Accuracy of State tertiary standards of measurement — maximum permissible uncertainty
[16] Regulation 27, heading
substitute
27 Accuracy of Inspectors’ Class 1 standards of measurement — maximum permissible uncertainty
[17] Regulation 28, heading
substitute
28 Accuracy of Inspectors’ Class 2 standards of measurement — maximum permissible uncertainty
[18] Regulation 29, heading
substitute
29 Accuracy of Inspectors’ Class 3 standards of measurement — maximum permissible uncertainty
[19] Subregulation 39 (2)
omit
subregulation (3)
insert
subregulation (1)
[20] Subregulation 39 (3)
substitute
(3) The Chief Metrologist must give a copy of a determination made under subregulation (1) to each certifying authority appointed in relation to a measuring instrument to which the determination applies.
[21] Subregulation 39 (4)
omit
subregulation (3).
insert
subregulation (1).
[22] Regulation 40
substitute
40 Recognition of foreign certification of measuring instruments
(1) The Chief Metrologist may issue a written notice recognising a measuring instrument that has been certified (however described) in a foreign country as a certified measuring instrument if:
(a) the certified values of the measuring instrument are established by means of, by reference to, by comparison with or by derivation from, the primary standards of measurement of the foreign country; and
(b) appropriate comparability is established between:
(i) the relevant primary standards of measurement of the foreign country; and
(ii) one or more Australian primary standards of measurement.
(2) A recognised measuring instrument is taken to be a certified measuring instrument.
(3) A written notice issued under subregulation (1) in relation to a measuring instrument is taken to be a certificate issued under regulation 37 for the measuring instrument.
[23] Regulation 53
substitute
53 Recognition of foreign reference materials
(1) The Chief Metrologist may issue a written notice recognising a reference material, or a reference material of a stated kind, that is certified (however described) in a foreign country as a certified reference material if:
(a) the certified values of the reference material, or of reference materials of that kind, are established by means of, by reference to, by comparison with or by derivation from, the primary standards of measurement of the foreign country; and
(b) appropriate comparability is established between:
(i) the relevant primary standards of measurement of the foreign country; and
(ii) one or more Australian primary standards of measurement.
(2) A recognised reference material, or a recognised reference material of a stated kind, is taken to be a certified reference material.
(3) A written notice issued under subregulation (1) in relation to a reference material, or a reference material of a stated kind, is taken to be a certificate issued under regulation 48 for the reference material or the reference material of that kind.
[24] Subregulation 60 (2)
omit
certifying
insert
approving
[25] After subregulation 60 (3)
insert
(3A) The Chief Metrologist may issue a certificate of approval other than on application.
[26] Subregulation 61 (2)
omit
certifying
insert
approving
[27] After subregulation 61 (4)
insert
(5) The Chief Metrologist may, other than on application, vary a certificate of approval issued by the Chief Metrologist.
[28] Regulation 68
substitute
68 Effect of variation and cancellation of approvals
If an approved pattern is varied or cancelled under this Part or under Part 8, a measuring instrument manufactured in accordance with the pattern before the variation or cancellation has effect is taken to continue to be in accordance with a pattern approved under these Regulations.
[29] Subregulation 73 (1)
substitute
(1) On application under regulation 72, the Chief Metrologist may appoint as a verifying or certifying authority an applicant who:
(a) in the opinion of the Chief Metrologist, is capable, or has direct control of staff who are capable, of verifying a standard of measurement, or certifying a measuring instrument or reference material, to which the application relates; or
(b) holds National Association of Testing Authorities accreditation that the Chief Metrologist considers appropriate to the functions mentioned in paragraph (a).
[30] Subregulation 79 (1)
substitute
(1) The grounds for cancelling the appointment of an authority, other than on application, are as follows:
(a) that the authority has not complied with a condition to which the appointment is subject;
(b) that, in the opinion of the Chief Metrologist, the authority does not have the necessary or appropriate facilities or standards to perform the functions or duties to which the appointment relates;
(c) that, in the opinion of the Chief Metrologist, the authority does not have the necessary competent staff to perform the functions or duties to which the appointment relates.
[31] Regulation 87
substitute
87 Exempt utility meters (Act s 3)
For the definition of utility meter in subsection 3 (1) of the Act, the following classes of meters are exempted from the operation of Part VA of the Act:
(a) gas meters;
(b) electricity meters;
(c) water meters installed before 1 July 2004;
(d) water meters installed on or after 1 July 2004, other than cold water meters with:
(i) a maximum continuous flow rate capacity of not more than 4 000 litres per hour; and
(ii) maximum permissible errors mentioned in clause 13 of Division 3 of Part 1 of Schedule 12.
Note Meters with a maximum continuous flow rate capacity of not more than 4 000 litres per hour are normally, but not exclusively, used for metering water supply to domestic premises.
[32] Regulation 88A
omit
[33] After regulation 90
insert
90A Identity cards
For subsection 18ZN (1) of the Act, an identity card issued to a person must set out the following information:
(a) the person’s full name;
(b) the name of the Commonwealth, State or Territory authority that employs the person or the name of the office that the person holds;
(c) a statement that the person has been appointed by the Secretary as an authorised officer under section 18ZM of the Act;
(d) a statement that the powers and obligations of an authorised officer are set out in Division 5 of Part VA of the Act;
(e) the person’s signature;
(f) the date of issue of the card;
(g) the identity card number;
(h) the expiry date of the identity card;
(i) instructions for the return of a lost identity card if found.
90B Fees
(1) For paragraph 20 (1) (l) of the Act, the fees for activities undertaken by the Commonwealth are set out in Schedule 13.
(2) In Schedule 13, level 1 applies to the following kinds of measuring instruments:
(a) simple liquor measures or dispensers;
(b) class 3 and 4 weighing instruments 100 kg;
(c) simple indicators or counters (for example, for weighing and flow);
(d) driveway flowmeter fuel dispenser consoles (excluding computer-based systems);
(e) pulse counters generators;
(f) milk tanks;
(g) vehicle and other tanks.
(3) In Schedule 13, level 2 applies to the following kinds of measuring instruments:
(a) multi-liquor measuring systems;
(b) class 1 and 2 weighing instruments;
(c) class 3 and 4 weighing instruments >100 kg;
(d) load cells;
(e) overhead-track weighing instruments;
(f) driveway flowmeters fuel dispensers (except liquefied petroleum gas flowmeters and multiproduct pumps);
(g) semi-automatic multi-dimensional measuring instruments;
(h) tank level gauges (excluding volume conversion devices);
(i) electronic flowmeter indicators or calculators;
(j) indicators with conversion or linearisation functions;
(k) milk meters;
(l) computer operated consoles for fuel dispensers;
(m) static wheel weighers;
(n) length measuring instruments;
(o) area measuring instruments;
(p) mass flowmeters.
(4) In Schedule 13, level 3 applies to the following kinds of measuring instruments:
(a) milk metering systems;
(b) belt weighers;
(c) bulk flowmeters (including mass meters);
(d) weighing-in-motion systems for trains and road vehicles;
(e) catchweighers;
(f) controllers and indicator calculators with conversion or linearisation functions;
(g) totalising hopper weighers;
(h) multi-product fuel dispensers and driveway and bulk flowmeters for liquefied petroleum gas;
(i) automatic multi-dimensional measuring instruments.
[34] Regulation 93, heading
substitute
93 Transitional — 1 October 1999
[35] Subregulations 93 (1) and (2)
omit
[36] Subregulation 93 (4)
omit
An
insert
Subject to subregulation (4A), an
[37] After subregulation 93 (4)
insert
(4A) An appointment mentioned in subregulation (4) expires:
(a) if an expiry date is not specified in the instrument of appointment — on 1 July 2005; and
(b) if an expiry date is specified in the instrument of appointment — on that date.
[38] After regulation 93
insert
94 Transitional — 1 July 2004
(1) In this regulation:
certificate of approval includes a varied certificate of approval.
Commission means the National Standards Commission.
Organisation means the Commonwealth Scientific and Industrial Research Organisation established under the Science and Industry Research Act 1949.
(2) An instrument issued by the Commission under regulation 21, 40 or 53 before 1 July 2004 is taken to be a written notice issued by the Chief Metrologist under that regulation.
(3) A determination that was made by the Commission or the Organisation under these Regulations and that was in force immediately before 1 July 2004 continues to have effect on and after that day as if it had been made by the Chief Metrologist under these Regulations.
(4) A certificate of approval issued by the Commission under these Regulations before 1 July 2004 is taken to be issued by the Chief Metrologist under these Regulations.
(5) A certificate issued under these Regulations before 1 July 2004 by the Commission or the Organisation acting in the capacity of a certifying authority is taken to be issued by the Chief Metrologist under these Regulations, subject to any condition stated in the certificate.
(6) A certificate of verification issued under these Regulations before 1 July 2004 by the Commission or the Organisation acting in the capacity of a verifying authority is taken to be issued by the Chief Metrologist under these Regulations, for the period, if any, for which the certificate is given.
(7) Subject to regulations 68 and 69, the cancellation, variation or withdrawal of an instrument by the Commission under Part 6 or 8 before 1 July 2004 is taken to be a cancellation, variation or withdrawal of the instrument by the Chief Metrologist under that Part.
(8) An appointment made by the Commission under these Regulations before 1 July 2004 is taken to be an appointment by the Chief Metrologist under these Regulations.
[39] Schedule 1, Part 2, after item 2.20
insert
2.21 | catalytic activity | katal | kat | The katal is a unit of catalytic activity equal to 1 mole per second. |
[40] Schedule 1, Part 3, items 3.13, 3.14 and 3.15
omit each mention of
interval
[41] Schedules 4 to 10
substitute
Schedule 4 Maximum permissible uncertainty — length (State primary and secondary standards)
(paragraphs 18 (5) (a) and 25 (a))
Column 1 | Column 2 | Column 3 | |
Denomination | Maximum permissible uncertainty (at 95% confidence interval): State primary standard | Maximum permissible uncertainty (at 95% confidence interval): State secondary standard | |
Part 1 Flexible standards | |||
10 m | 0.08 mm | 0.15 mm | |
> 10 m | 0.001% | 0.002% | |
Part 2 Rigid standards | |||
1 m | 0.008 mm | 0.015 mm | |
Schedule 5 Maximum permissible uncertainty — mass (State primary, secondary and tertiary standards)
(paragraphs 18 (5) (b) and (c), 25 (b) and 26 (a) and subparagraphs 25 (d) (i) and 26 (c) (i))
Column 1 Denomination | Column 2 Maximum permissible uncertainty (at 95% confidence interval): State primary standard (in mg) | Column 3 Maximum permissible uncertainty (at 95% confidence interval): | Column 4 Maximum permissible uncertainty (at 95% confidence interval): State tertiary standard (in mg) |
50 kg |
| 115.000 | 150.00 |
25 kg |
| 55.000 | 75.00 |
20 kg | 15.000 | 45.000 | 60.00 |
10 kg | 8.000 | 20.000 | 30.00 |
5 kg | 4.000 | 10.000 | 15.00 |
2 kg | 2.000 | 5.000 | 10.00 |
1 kg | 1.000 | 2.000 | 7.00 |
500 g | 0.400 | 1.100 | 4.90 |
200 g | 0.200 | 0.500 | 3.20 |
100 g | 0.100 | 0.200 | 2.30 |
50 g | 0.040 | 0.110 | 1.60 |
20 g | 0.020 | 0.050 | 1.00 |
10 g | 0.010 | 0.020 | 0.70 |
5 g | 0.010 | 0.020 | 0.49 |
2 g | 0.010 | 0.020 | 0.32 |
1 g | 0.010 | 0.020 | 0.23 |
500 mg | 0.004 | 0.010 | 0.16 |
200 mg | 0.004 | 0.010 | 0.10 |
100 mg | 0.004 | 0.010 | 0.07 |
50 mg | 0.002 | 0.005 | 0.05 |
20 mg | 0.002 | 0.005 | 0.03 |
10 mg | 0.002 | 0.005 | 0.02 |
5 mg | 0.002 | 0.005 | 0.02 |
2 mg | 0.002 | 0.005 | 0.01 |
1 mg | 0.002 | 0.005 | 0.01 |
Schedule 6 Maximum permissible uncertainty — volume (State secondary and tertiary standards)
(paragraph 25 (c), subparagraph 25 (d) (ii),
paragraph 26 (b) and subparagraph 26 (c) (ii))
Column 1 Denomination | Column 2 Maximum permissible uncertainty (at 95% confidence interval): State secondary standard (in mL) | Column 3 Maximum permissible uncertainty (at 95% confidence interval): State tertiary standard (in mL) |
10 000 L | 750.000 | 1 500.000 |
5 000 L | 400.000 | 750.000 |
2 000 L | 150.000 | 300.000 |
1 000 L | 75.000 | 150.000 |
500 L | 40.000 | 75.000 |
200 L | 15.000 | 30.000 |
100 L | 8.000 | 15.000 |
50 L | 4.000 | 7.000 |
20 L | 1.500 | 4.000 |
15 L | 1.100 | 3.000 |
10 L | 0.800 | 2.000 |
5 L | 0.400 | 2.000 |
2 L | 0.200 | 1.000 |
1 L | 0.100 | 0.500 |
500 mL | 0.040 | 0.300 |
250 mL | 0.020 | 0.200 |
200 mL | 0.020 | 0.170 |
100 mL | 0.010 | 0.110 |
50 mL | 0.004 | 0.070 |
25 mL | 0.004 | 0.050 |
20 mL | 0.004 | 0.040 |
10 mL | 0.004 | 0.020 |
5 mL | 0.004 | 0.020 |
2 mL | 0.004 | 0.010 |
1 mL | 0.002 | 0.003 |
0.5 mL | 0.001 | 0.002 |
0.2 mL | 0.001 | 0.002 |
0.1 mL | 0.001 | 0.002 |
Schedule 7 Maximum permissible uncertainty and maximum permissible variation — length (Inspectors’ Class 1 and Class 2 standards)
(paragraphs 27 (a), 28 (a), 32 (a) and 33 (a))
Column 1 Denomination | Column 2 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 1 standard | Column 3 Maximum permissible variation: Inspectors’ Class 1 standard | Column 4 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 2 standard | Column 5 Maximum permissible variation: Inspectors’ Class 2 |
Part 1 Flexible standards | ||||
10 m | 0.4 mm | 1.5 mm | 1.1 mm | 5.0 mm |
> 10 m | 0.004% | 0.015% | 0.011% | 0.05% |
Part 2 Rigid standards | ||||
500 mm | 0.04 mm | 0.15 mm |
|
|
> 500 mm but 1 m | 0.04 mm | 0.20 mm |
|
|
> 1 m but 2 m | 0.05 mm | 0.20 mm |
|
|
Schedule 8 Maximum permissible uncertainty and maximum permissible variation — area (Inspectors’ Class 1 standards)
(paragraph 27 (b), subparagraph 27 (e) (i) and
regulation 32)
Column 1 Denomination not exceeding (in dm2) | Column 2 Maximum permissible uncertainty (at 95% confidence interval) | Column 3 Maximum permissible variation |
35 | 0.05 | 0.18 |
40 | 0.05 | 0.20 |
50 | 0.06 | 0.25 |
60 | 0.08 | 0.30 |
70 | 0.09 | 0.35 |
80 | 0.10 | 0.40 |
90 | 0.11 | 0.45 |
100 | 0.13 | 0.50 |
150 | 0.15 | 0.75 |
Schedule 9 Maximum permissible uncertainty and maximum permissible variation — mass (Inspectors’ Class 1, Class 2 and Class 3 standards)
(paragraph 27 (c), subparagraph 27 (e) (ii),
paragraphs 28 (b) and (c) and regulations 29, 32, 33
and 34)
Column 1 Denomin-ation | Column 2 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 1 standard (in mg) | Column 3 Maximum permissible variation: Inspectors’ Class 1 standard (in mg) | Column 4 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 2 standard (in mg) | Column 5 Maximum permissible variation: Inspectors’ Class 2 standard (in mg) | Column 6 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 3 standard (in mg) | Column 7 Maximum permissible variation: Inspectors’ Class 3 standard (in mg) |
10 000 kg |
|
|
|
| 177 000 | 700 000 |
1 000 kg |
|
|
|
| 17 700 | 70 000 |
500 kg |
|
|
|
| 8 800 | 35 000 |
200 kg |
|
|
|
| 3 500 | 14 000 |
100 kg |
|
|
|
| 1 750 | 7 000 |
50 kg | 150.00 | 200.00 | 150.00 | 400.000 | 870 | 3 500 |
25 kg | 75.00 | 100.00 | 75.00 | 200.000 | 440 | 1 750 |
20 kg | 60.00 | 80.00 | 60.00 | 160.000 | 380 | 1 550 |
10 kg | 30.00 | 40.00 | 30.00 | 80.000 | 270 | 1 100 |
5 kg | 15.00 | 28.00 | 15.00 | 55.000 | 200 | 780 |
2 kg | 10.00 | 18.00 | 10.00 | 35.000 | 125 | 500 |
1 kg | 7.00 | 13.00 | 7.00 | 25.000 | 85 | 350 |
500 g | 4.90 | 9.00 | 4.90 | 18.000 | 60 | 250 |
200 g | 3.20 | 6.00 | 3.20 | 11.000 | 40 | 160 |
100 g | 2.30 | 4.00 | 2.30 | 8.000 | 25 | 110 |
50 g | 1.60 | 3.00 | 1.60 | 5.000 |
|
|
20 g | 1.00 | 2.00 | 1.00 | 3.500 |
|
|
10 g | 0.70 | 1.50 | 0.70 | 2.500 |
|
|
5 g | 0.49 | 1.00 | 0.49 | 2.000 |
|
|
2 g | 0.32 | 0.60 | 0.32 | 1.000 |
|
|
1 g | 0.23 | 0.40 | 0.23 | 0.800 |
|
|
500 mg | 0.16 | 0.30 | 0.16 | 0.600 |
|
|
200 mg | 0.10 | 0.20 | 0.10 | 0.350 |
|
|
100 mg | 0.07 | 0.15 | 0.07 | 0.250 |
|
|
50 mg | 0.05 | 0.10 | 0.05 | 0.200 |
|
|
20 mg | 0.03 | 0.06 | 0.03 | 0.100 |
|
|
10 mg | 0.02 | 0.04 | 0.02 | 0.080 |
|
|
5 mg | 0.02 | 0.03 | 0.02 | 0.060 |
|
|
2 mg | 0.01 | 0.02 | 0.01 | 0.035 |
|
|
1 mg | 0.01 | 0.02 | 0.01 | 0.025 |
|
|
Schedule 10 Maximum permissible uncertainty and maximum permissible variation — volume (Inspectors’ Class 1 standards)
(paragraph 27 (d), subparagraph 27 (e) (iii) and
regulation 32)
Column 1 Denomination | Column 2 Maximum permissible uncertainty (at 95% confidence interval) (in mL) | Column 3 Maximum permissible variation (in mL) |
10 000 L | 1 500.000 | 6 000.00 |
5 000 L | 750.000 | 3 000.00 |
2 000 L | 300.000 | 1 200.00 |
1 000 L | 150.000 | 600.00 |
500 L | 75.000 | 300.00 |
200 L | 30.000 | 120.00 |
100 L | 15.000 | 60.00 |
50 L | 7.000 | 27.00 |
20 L | 4.000 | 15.00 |
15 L | 3.000 | 12.00 |
10 L | 2.000 | 9.00 |
5 L | 2.000 | 6.00 |
2 L | 1.000 | 3.00 |
1 L | 0.500 | 2.00 |
500 mL | 0.300 | 1.20 |
250 mL | 0.200 | 0.80 |
200 mL | 0.170 | 0.70 |
100 mL | 0.110 | 0.40 |
50 mL | 0.070 | 0.27 |
25 mL | 0.050 | 0.17 |
20 mL | 0.040 | 0.15 |
10 mL | 0.020 | 0.09 |
5 mL | 0.020 | 0.06 |
2 mL | 0.010 | 0.03 |
1 mL | 0.003 | 0.02 |
0.5 mL | 0.002 | 0.01 |
0.2 mL | 0.002 | 0.01 |
0.1 mL | 0.002 | 0.01 |
[42] Schedule 12, Part 1, after clause 3.3
insert
3.3A Beverage dispensers for alcoholic liquor
| Maximum permissible error | |
Capacity (mL) | Verification/certification | Reverification |
10 | ±0.5 mL | +1.0, –0.5 mL |
15 | ±0.6 mL | +1.2, –0.6 mL |
30 | ±1.0 mL | +2.0, –1.0 mL |
60–100 | ±1.5 mL | +3.0, –1.5 mL |
> 100 | ±1.5% of quantity dispensed | +3.0%, –1.5% of quantity dispensed |
[43] Schedule 12, Part 1, clause 3.5, heading
substitute
3.5 Portable measures for potable liquids
[44] Schedule 12, Part 1, clause 3.8, table heading
after
error
insert
at each scale mark on a particular measure
[45] Schedule 12, Part 1, Division 2, heading
substitute
Division 2 Measuring instruments
[46] Schedule 12, Part 1, clause 6, at the foot
insert
Maximum capacity (L) | Maximum scale interval (L) |
1 000 | 2 |
1 000 2 500 | 5 |
2 500 5 000 | 10 |
5 000 10 000 | 20 |
10 000 25 000 | 50 |
[47] Schedule 12, Part 1, after subclause 8.2.3
insert
8.2.4 Maximum permissible errors on calculators
Maximum permissible errors on quantities of liquid indications applicable to calculators, positive or negative, when they are tested separately, are equal to 1/10 the maximum permissible error defined in line A of table 2. However, the magnitude of the maximum permissible error must not be less than one half-scale interval of the measuring system in which the calculator is intended to be included.
[48] Schedule 12, Part 1, clause 8.5
omit
[49] Schedule 12, Part 1, clause 9.3
substitute
9.3 Belt weighers
Class | Maximum permissible error |
0.5 | ±0.25% |
1.0 | ±0.5% |
2.0 | ±1.0% |
[50] Schedule 12, Part 1, after clause 9.3
insert
9.4 Catch weighers
The maximum permissible error for any load equal to or greater than the minimum capacity and equal to or less than the maximum capacity in automatic operation is:
Load (m) expressed in verification scale intervals (e) | Maximum permissible error for class Y(y) instruments | ||
Class Y (a) | Class Y (b) | Initial verification | In-service |
0<m 500 | 0<m 50 | 1.5 e | 2 e |
500<m 2 000 | 50<m 200 | 2 e | 3 e |
2 000<m 10 000 | 200<m 1 000 | 2.5 e | 4 e |
[51] Schedule 12, Part 1, clause 10.1
omit everything after paragraph (d), insert
An instrument may be in an accuracy class for wagon weighing that is different from that for train weighing.
[52] Schedule 12, Part 1, subclause 10.2.1
omit everything after Table 1, insert
10.2.1.1 Wagon weighing
The maximum permissible error for coupled or uncoupled wagon weighing is the greatest of the following values:
(a) the value calculated according to table 1, rounded to the nearest scale interval (d);
(b) the value calculated according to table 1, rounded to the nearest scale interval for the weight of a single wagon equal to 35% of the maximum wagon weight (as inscribed on the descriptive markings);
(c) 1 d.
10.2.1.2 Train weighing
The maximum permissible error for coupled or uncoupled wagon weighing is the greatest of the following values:
(a) the value calculated according to table 1, rounded to the nearest scale interval (d);
(b) the value calculated according to table 1 for the weight of a single wagon equal to 35% of the maximum wagon weight (as inscribed on the descriptive markings) multiplied by the number of reference wagons in the train (not exceeding 10 wagons) and rounded to the nearest scale interval;
(c) 1 d for each wagon in the train, but not exceeding 10 d.
[53] Schedule 12, Part 1, after clause 10
insert
11 Multi-dimensional measuring (cubing) instruments
11.1 Scale intervals, minimum dimension
The lower limit of the minimum dimension for all values of the scale interval (d) is:
Scale interval (d) | Minimum dimension (lower limit) |
d 2 cm | 10 d |
2 cm < d 10 cm | 20 d |
10 cm < d | 50 d |
11.2 Value of maximum permissible error
The maximum permissible error applicable to the measurement by the instrument of any of the 3 dimensions for initial and subsequent verification is 1 d.
12 Grain protein measuring instruments
The maximum permissible errors at verification, certification and reverification are:
(a) wheat — 0.4%; and
(b) barley — 0.5%.
Division 3 Utility meters
13 Water meters
13.1 Maximum permissible errors
13.1.1 The maximum permissible errors for water meters are:
Table 1 Maximum permissible errors (%) | |
Initial verification | In-service |
±5% in the flow rate range where the flow rate (Q) is greater than or equal to the minimum flow rate (Q1)and less than the transitional flow rate (Q2). ie: Q1 Q < Q2 ±2% in the flow rate range if the flow rate (Q) is greater than or equal to the transitional flow rate (Q2) and less than or equal to the maximum flow rate (Q4). ie: Q2 Q Q4 | ±4% in the flow rate range if the flow rate (Q) is greater than or equal to 0.075 times the maximum continuous flow rate (Q3) and less than or equal to the maximum flow rate (Q4). ie: 0.075 Q3 Q Q4 |
Note The definitions in this table are taken from NSC R 49-1, which is based on OIML R 49-1:2000.
[54] Schedule 12, Part 2
substitute
Part 2 Reverification or in-service inspection of measures and measuring instruments
The maximum permissible errors (where v is the absolute value of the maximum permissible error at certification or verification) for measures and measuring instruments for use for trade, except utility meters, are:
|
| Maximum permissible error | |
Item | Measure or measuring instrument | Deficiency | Excess |
1 | Measure of length | v | v |
2 | Measure of weight | 0.5v | v |
3 | Measures of volume (a) Glass measures (i) Line measures (ii) Brim measures |
v 0 |
v v |
| (b) Metal measures (i) Line measures (ii) Brim measures |
2v v |
2v v |
4 | Length-measuring instruments | 2v | 2v |
5 | Area-measuring instruments | 2v | 2v |
6 | Farm milk tanks | v | v |
7 | Vehicle tanks | v | v |
8 | Liquid-measuring instruments | v | v |
9 | Weighing instruments | v | v |
10 | Weighing-in-motion | 2v | 2v |
11 | Beverage measures | v | 2v |
[55] After Schedule 12
insert
Schedule 13 Fees
(regulation 90B)
Part 1 Examination and certification of patterns of measuring instruments
Division 1 Volume measuring instruments
|
|
|
| Fee ($) |
|
Item | Activity code | Activity | Level 1 | Level 2 | Level 3 |
1.1 | AP | Application for examination | 220 | 220 | 220 |
1.2 | IA | Initial assessment | 440 | 880 | 1 430 |
1.3 | IP | Initial performance | 1 650 | 3 520 | 4 620 |
1.4 | TT | Temperature test | 1 320 | 1 650 | 1 760 |
1.5 | HU | Humidity test | 1 540 | 1 760 | 1 870 |
1.6 | VT | Voltage test | 550 | 660 | 770 |
1.7 | LB | Line-borne test | 660 | 660 | 660 |
1.8 | SD | Static discharge test | 880 | 990 | 1 100 |
1.9 | EMS | Electromagnetic susceptibility tests | 1 650 | 1 870 | 1 980 |
1.10 | ESS | Endurance span stability tests | 1 100 | 1 540 | 2 090 |
1.11 | EXT | Extra or miscellaneous tests | 220 | 550 | 660 |
1.12 | CHK | Completion of checklist | 330 | 660 | 770 |
1.13 | SR | Preparation of summary report | 220 | 330 | 440 |
1.14 | RSF | Resubmission | 880 | 880 | 880 |
1.15 | CP | Issue of certificate of approval | 440 | 550 | 660 |
1.16 | HRS | Consultations, performance and other tests (plus charges for equipment used) | 136.40/hr | 136.40/hr | 136.40/hr |
Division 2 Weighing instruments
|
|
|
| Fee ($) |
|
Item | Activity Code | Activity | Level 1 | Level 2 | Level 3 |
2.1 | AP | Application for examination | 220 | 220 | 220 |
2.2 | IA | Initial assessment | 440 | 550 | 660 |
2.3 | IP | Initial performance | 2 090 | 2 640 | 3 190 |
2.4 | TT | Temperature test | 2 090 | 2 310 | 2 750 |
2.5 | HU | Humidity test | 2 090 | 2 420 | 2 750 |
2.6 | VT | Voltage test | 660 | 880 | 990 |
2.7 | LB | Line-borne test | 660 | 770 | 880 |
2.8 | SD | Static discharge test | 880 | 1 100 | 1 320 |
2.9 | EMS | Electromagnetic susceptibility tests | 1 760 | 2 090 | 2 420 |
2.10 | ESS | Endurance span stability tests | 440 | 550 | 660 |
2.11 | EXT | Extra or miscellaneous tests | 550 | 660 | 770 |
2.12 | CHK | Completion of checklist | 660 | 880 | 990 |
2.13 | SR | Preparation of summary report | 440 | 550 | 660 |
2.14 | RSF | Resubmission | 880 | 880 | 880 |
2.15 | CP | Issue of certificate of approval | 440 | 660 | 770 |
2.16 | HRS | Consultations, performance and other tests (plus charges for equipment used) | 136.40/hr | 136.40/hr | 136.40/hr |
2.17 | GENCERT | Analysis of 6B/0 calculations | 154 | 154 | 154 |
Division 3 Utility meters
Item | Activity code | Activity | Fee |
3.1 | AP | Application for examination | 220 |
3.2 | SR | Preparation of summary report | 1 650 |
3.3 | CP | Issue of certificate of approval | 660 |
3.4 | HRS | Consultations, performance and other tests (plus charges for equipment used) | 136.40/hr |
Division 4 Examination and certification of patterns of measuring instruments under mutual recognition agreements
Item | Activity code | Activity | Fee |
4.1 | AP | Application for examination | 220 |
4.2 | SR | Preparation of summary report | 1 650 |
4.3 | CP | Issue of certificate of approval | 660 |
4.4 | HRS | Consultations, performance and other tests (plus fees for equipment used) | 136.40/hr |
Division 5 Additional fees for use of equipment
Item | Activity code | Equipment used | Fee ($/hr) |
5.1 | LARLOA | Large load cell facility (capacity 600 kg to 50 000 kg) | 44 |
5.2 | SMALOA | Small load cell facility (capacity 50 kg to 500 kg) | 33 |
5.3 | LIQHYD | Liquid hydrocarbons test facility | 132 |
5.4 | LPG | Liquefied petroleum gas test facility | 55 |
5.5 | TEMP | Temperature controlled chamber | 22 |
5.6 | HUM | Humidity test chamber | 33 |
5.7 | REL | Reliability testing equipment | 11 |
5.8 | LINBOR | Line-borne interference test equipment | 44 |
5.9 | EMS | Electromagnetic susceptibility testing chamber | 110 |
5.10 | ESD | Electrostatic discharge test equipment | 44 |
Part 2 Verification of utility meters used for trade
Item | Activity code | Activity | Fee |
1 | VUM | Verification of utility meters | 1 000 |
[56] Further amendments — Chief Metrologist
Provision | omit each mention of | insert |
Regulation 3, definition of approving authority, paragraph (a) | Commission; | Chief Metrologist; |
Regulation 3, definition of certifying authority, paragraph (a) | Commission or the Organisation; | Chief Metrologist; |
Regulation 3, definition of certifying authority, paragraph (b) | Commission; | Chief Metrologist; |
Regulation 3, definition of verifying authority, paragraph (a) | Organisation; | Chief Metrologist; |
Regulation 3, note | the Commission | the Chief Metrologist |
Regulation 9 | Organisation | Chief Metrologist |
Paragraph 12 (2) (a) | Commission | Chief Metrologist |
Subregulation 16 (2) | Organisation | Chief Metrologist |
Subregulation 17 (2) | Organisation. | Chief Metrologist. |
Subregulation 18 (4) | Organisation. | Chief Metrologist. |
Subregulation 19 (2) | Commission. | Chief Metrologist. |
Paragraph 36 (2) (a) | Commission | Chief Metrologist |
Subregulation 39 (1) | Commission | Chief Metrologist |
Paragraph 46 (2) (a) | Commission | Chief Metrologist |
Subregulation 51 (2) | Commission | Chief Metrologist |
Regulation 52, heading | Commission | Chief Metrologist |
Subregulation 52 (1) | Commission | Chief Metrologist |
Subregulation 52 (2) | Commission | Chief Metrologist |
Subregulation 52 (3) | Commission | Chief Metrologist |
Paragraph 55 (j) | Commission | Chief Metrologist |
Paragraph 58 (2) (a) | Commission | Chief Metrologist |
Subregulation 60 (3) | Commission | Chief Metrologist |
Subregulation 61 (3) | Commission | Chief Metrologist |
Subregulation 61 (4) | Commission | Chief Metrologist |
Paragraph 64 (1) (b) | Commission | Chief Metrologist |
Subregulation 64 (2) | Commission | Chief Metrologist |
Subregulation 64 (3) | Commission | Chief Metrologist |
Paragraph 64 (3) (a) | Commission | Chief Metrologist |
Subregulation 64 (4) | Commission | Chief Metrologist |
Subregulation 64 (5) | Commission | Chief Metrologist |
Paragraph 65 (1) (b) | Commission | Chief Metrologist |
Paragraph 65 (1) (c) | Commission | Chief Metrologist |
Subregulation 65 (2) | Commission | Chief Metrologist |
Subregulation 65 (3) | Commission: | Chief Metrologist: |
Paragraph 65 (3) (b) | Commission | Chief Metrologist |
Subregulation 71 (1) | Commission | Chief Metrologist |
Subregulation 71 (2) | Commission | Chief Metrologist |
Paragraph 72 (1) (a) | Commission | Chief Metrologist |
Paragraph 72 (1) (b) | Commission. | Chief Metrologist. |
Subregulation 72 (2) | Commission | Chief Metrologist |
Subregulation 72 (3) | Commission | Chief Metrologist |
Subregulation 72 (4) | Commission | Chief Metrologist |
Subregulation 73 (3) | Commission | Chief Metrologist |
Subregulation 76 (1) | Commission | Chief Metrologist |
Subregulation 76 (2) | Commission | Chief Metrologist |
Subregulation 76 (4) | Commission | Chief Metrologist |
Paragraph 77 (1) (a) | Commission | Chief Metrologist |
Paragraph 77 (1) (b) | Commission; | Chief Metrologist; |
Paragraph 77 (1) (c) | Commission, | Chief Metrologist, |
Subregulation 78 (1) | Commission: | Chief Metrologist: |
Subregulation 78 (2) | Commission | Chief Metrologist |
Regulation 80, definition of Commission | Commission | Chief Metrologist |
Subregulation 82 (1) | Commission | Chief Metrologist |
Paragraph 82 (1) (a) | Commission | Chief Metrologist |
Paragraph 82 (1) (b) | Commission | Chief Metrologist |
Paragraph 82 (1) (e) | Commission | Chief Metrologist |
Subregulation 82 (2) | Commission | Chief Metrologist |
Subregulation 82 (3) | Commission | Chief Metrologist |
Subregulation 82 (4) | Commission | Chief Metrologist |
Paragraph 82 (4) (b) | Commission | Chief Metrologist |
Paragraph 83 (a) | Commission | Chief Metrologist |
Paragraph 83 (b) | Commission | Chief Metrologist |
Regulation 84, definition of decision maker, paragraph (b) | Commission. | Chief Metrologist. |
Schedule 1, Part 1, clause 1.1, note | Commission | Chief Metrologist |
[57] Further amendments — maximum permissible uncertainty and maximum permissible variation
Provision | omit each mention of | insert |
Paragraph 18 (5) (a) | amount of | maximum |
Paragraph 18 (5) (b) | amount of | maximum |
Paragraph 18 (5) (c) | amount of | maximum |
Paragraph 23 (b) | not within the | exceeding the maximum |
Paragraph 25 (a) | amount of | maximum |
Paragraph 25 (b) | amount of | maximum |
Paragraph 25 (c) | amount of | maximum |
Paragraph 25 (d) | amount of | maximum |
Paragraph 25 (d) | amounts of | maximum |
Paragraph 26 (a) | amount of | maximum |
Paragraph 26 (b) | amount of | maximum |
Paragraph 26 (c) | amount of | maximum |
Paragraph 26 (c) | amounts of | maximum |
Paragraph 27 (a) | amount of | maximum |
Paragraph 27 (b) | amount of | maximum |
Paragraph 27 (c) | amount of | maximum |
Paragraph 27 (d) | amount of | maximum |
Paragraph 27 (e) | amount of | maximum |
Paragraph 27 (e) | amounts of | maximum permissible |
Paragraph 28 (a) | amount of | maximum |
Paragraph 28 (b) | amount of | maximum |
Paragraph 28 (c) | amount of | maximum |
Paragraph 28 (c) | amounts of | maximum |
Paragraph 29 (a) | amount of | maximum |
Paragraph 29 (b) | amount of | maximum |
Paragraph 29 (b) | amounts of | maximum |
Regulation 30, heading | permissible | maximum permissible |
Subregulation 30 (2) | permissible | maximum permissible |
Regulation 30, note | permissible | maximum permissible |
Regulation 31, heading | permissible | maximum permissible |
Subregulation 31 (1) | permissible | maximum permissible |
Subregulation 31 (2) | permissible | maximum permissible |
Regulation 32, heading | Permissible | Maximum permissible |
Regulation 32 | permissible | maximum permissible |
Paragraph 32 (a) | amount | maximum permissible variation |
Paragraph 32 (b) | amount | maximum permissible variation |
Paragraph 32 (b) | amounts of | maximum |
Regulation 33, heading | Permissible | Maximum permissible |
Paragraph 33 (a) | amount | maximum permissible variation |
Paragraph 33 (b) | amount | maximum permissible variation |
Paragraph 33 (b) | amounts of | maximum |
Regulation 34, heading | Permissible | Maximum permissible |
Regulation 34 | permissible | maximum permissible |
Paragraph 34 (a) | amount | maximum permissible variation |
Paragraph 34 (b) | amount | maximum permissible variation |
Paragraph 34 (b) | amounts of | maximum |
Schedule 2 Amendments commencing on 1 July 2005
(regulation 3)
[1] Schedule 5
substitute
Schedule 5 Maximum permissible uncertainty — mass (State primary, secondary and tertiary standards)
(paragraphs 18 (5) (b) and (c), 25 (b) and 26 (a) and subparagraphs 25 (d) (i) and 26 (c) (i))
Column 1 Denomination | Column 2 Maximum permissible uncertainty (at 95% confidence interval): State primary standard (in mg) | Column 3 Maximum permissible uncertainty (at 95% confidence interval): State secondary standard (in mg) | Column 4 Maximum permissible uncertainty (at 95% confidence interval): State tertiary standard (in mg) |
50 kg |
| 84.000 | 267.00 |
25 kg |
| 42.000 | 127.00 |
20 kg | 10.000 | 33.000 | 100.00 |
10 kg | 5.000 | 17.000 | 53.00 |
5 kg | 3.000 | 8.000 | 27.00 |
2 kg | 1.000 | 3.000 | 10.00 |
1 kg | 0.500 | 2.000 | 6.00 |
500 g | 0.300 | 0.800 | 2.70 |
200 g | 0.100 | 0.300 | 1.00 |
100 g | 0.050 | 0.200 | 0.60 |
50 g | 0.030 | 0.100 | 0.40 |
20 g | 0.030 | 0.080 | 0.30 |
10 g | 0.020 | 0.070 | 0.20 |
5 g | 0.020 | 0.050 | 0.17 |
2 g | 0.010 | 0.040 | 0.14 |
1 g | 0.010 | 0.030 | 0.10 |
500 mg | 0.008 | 0.030 | 0.09 |
200 mg | 0.007 | 0.020 | 0.07 |
100 mg | 0.005 | 0.020 | 0.06 |
50 mg | 0.004 | 0.010 | 0.04 |
20 mg | 0.003 | 0.010 | 0.04 |
10 mg | 0.003 | 0.008 | 0.03 |
5 mg | 0.002 | 0.007 | 0.02 |
2 mg | 0.002 | 0.007 | 0.02 |
1 mg | 0.002 | 0.007 | 0.02 |
Note The maximum permissible uncertainties in this table are based on OIML R 111.
[2] Schedule 9
substitute
Schedule 9 Maximum permissible uncertainty and maximum permissible variation — mass (Inspectors’ Class 1, Class 2 and Class 3 standards)
(paragraph 27 (c), subparagraph 27 (e) (ii),
paragraphs 28 (b) and (c) and regulations 29, 32, 33
and 34)
Column 1 Denomin-ation | Column 2 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 1 standard (in mg) | Column 3 Maximum permissible variation: Inspectors’ Class 1 standard (in mg) | Column 4 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 2 standard (in mg) | Column 5 Maximum permissible variation: Inspectors’ Class 2 standard (in mg) | Column 6 Maximum permissible uncertainty (at 95% confidence interval): Inspectors’ Class 3 standard (in mg) | Column 7 Maximum permissible variation: Inspectors’ Class 3 standard (in mg) |
10 000 kg |
|
|
|
| 533 333 | 1 066 667 |
5 000 kg |
|
|
|
| 266 667 | 533 333 |
2 000 kg |
|
|
|
| 100 000 | 200 000 |
1 000 kg |
|
|
|
| 53 333 | 106 667 |
500 kg |
|
|
|
| 26 667 | 53 333 |
200 kg |
|
|
|
| 10 000 | 20 000 |
100 kg |
|
|
|
| 5 333 | 10 667 |
50 kg | 267.000 | 533.000 | 833.000 | 1 667.00 | 2 667 | 5 333 |
25 kg | 127.000 | 253.000 | 417.000 | 833.00 | 1 267 | 2 533 |
20 kg | 100.000 | 200.000 | 333.000 | 667.00 | 1 000 | 2 000 |
10 kg | 53.000 | 107.000 | 167.000 | 333.00 | 533 | 1 067 |
5 kg | 27.000 | 53.000 | 83.000 | 167.00 | 267 | 533 |
2 kg | 10.000 | 20.000 | 33.000 | 67.00 | 100 | 200 |
1 kg | 6.000 | 11.000 | 17.000 | 33.00 | 53 | 107 |
500 g | 2.700 | 5.300 | 8.500 | 16.70 | 27 | 53 |
200 g | 1.000 | 2.000 | 3.500 | 6.70 | 10 | 20 |
100 g | 0.600 | 1.070 | 1.700 | 3.30 | 5 | 11 |
50 g | 0.400 | 0.670 | 1.000 | 2.00 |
|
|
20 g | 0.300 | 0.530 | 0.800 | 1.70 |
|
|
10 g | 0.200 | 0.400 | 0.700 | 1.30 |
|
|
5 g | 0.170 | 0.330 | 0.550 | 1.10 |
|
|
2 g | 0.140 | 0.270 | 0.400 | 0.80 |
|
|
1 g | 0.100 | 0.200 | 0.350 | 0.67 |
|
|
500 mg | 0.085 | 0.170 | 0.270 | 0.53 |
|
|
200 mg | 0.070 | 0.130 | 0.200 | 0.40 |
|
|
100 mg | 0.055 | 0.110 | 0.170 | 0.33 |
|
|
50 mg | 0.040 | 0.080 | 0.130 | 0.27 |
|
|
20 mg | 0.035 | 0.070 | 0.100 | 0.20 |
|
|
10 mg | 0.030 | 0.050 | 0.080 | 0.17 |
|
|
5 mg | 0.020 | 0.040 | 0.070 | 0.13 |
|
|
2 mg | 0.020 | 0.040 | 0.070 | 0.13 |
|
|
1 mg | 0.020 | 0.040 | 0.070 | 0.13 |
|
|
Note The maximum permissible uncertainties in this table are based on OIML R 111.
Notes
1. These Regulations amend Statutory Rules 1999 No.110, as amended by 1999 No. 185; Act No. 27, 2004.
2. Notified in the Commonwealth of Australia Gazette on 18 June 2004.