National Measurement Amendment Regulations 2010 (No. 1)1
Select Legislative Instrument 2010 No. 179
I, QUENTIN BRYCE, Governor-General of the Commonwealth of Australia, acting with the advice of the Federal Executive Council, make the following Regulations under the National Measurement Act 1960.
Dated 29 June 2010
QUENTIN BRYCE
Governor-General
By Her Excellency’s Command
KIM CARR
Contents
1 Name of Regulations
2 Commencement
3 Amendment of National Measurement Regulations 1999
4 Amendment of National Measurement Regulations 1999
5 Transitional
Schedule 1 Amendments commencing on 1 July 2010
Schedule 2 Amendments commencing on commencement of Schedule 1 to National Measurement Amendment Act 2010
These Regulations are the National Measurement Amendment Regulations 2010 (No. 1).
These Regulations commence as follows:
(a) on 1 July 2010 — regulations 1 to 3 and 5 and Schedule 1;
(b) on the commencement of Schedule 1 to the National Measurement Amendment Act 2010 — regulation 4 and Schedule 2.
3 Amendment of National Measurement Regulations 1999
Schedule 1 amends the National Measurement Regulations 1999.
4 Amendment of National Measurement Regulations 1999
Schedule 2 amends the National Measurement Regulations 1999.
Despite the repeal by these Regulations of paragraph (b) of the definition of certification in regulation 3 of the National Measurement Regulations 1999, that paragraph continues to have effect in relation to an application for certification of a measuring instrument in use for trade made before the commencement of these Regulations.
Schedule 1 Amendments commencing on 1 July 2010
(regulation 3)
[1] Regulation 3, after definition of approving authority
insert
artefact means a physical object that is not a standard of measurement.
[2] Regulation 3, definition of certificate of verification
omit
regulation 13
insert
regulation 13 or 34C
[3] Regulation 3, definition of certification
substitute
certification means:
(a) for a measuring instrument — certification of the instrument under regulation 37; and
(b) for a reference material — certification of the material under regulation 48.
[4] Regulation 3, definition of certified reference material
omit
[5] Regulation 3, definition of maximum permissible error, paragraph (b)
substitute
(b) otherwise — is mentioned in Schedule 1 of the National Trade Measurement Regulations 2009 or Schedule 12 to these Regulations, for a material measure or measuring instrument of that kind.
[6] Regulation 3, definition of verification
substitute
verification means:
(a) for a standard of measurement — verification of the standard under regulation 13; or
(b) for an artefact — verification of a physical quantity of an artefact under regulation 34C.
[7] Regulation 3, definition of verifying authority
substitute
verifying authority means:
(a) for standards of measurement and artefacts — the Chief Metrologist; or
(b) for a particular reference standard of measurement — a body or person appointed under regulation 73 in relation to reference standards of measurement of the same kind as the particular reference standard of measurement; or
(c) for a particular artefact — a body or person appointed under regulation 73 in relation to an artefact of the same kind as the particular artefact.
[8] Subregulation 13 (5)
omit
[9] Regulation 14, heading
substitute
14 Decision not to verify, or delay in verifying, standard of measurement
[10] After Part 3
insert
Part 3A Artefacts
Division 1 General
34A Verification relating to artefacts
(1) A verifying authority may verify a physical quantity of an artefact by making a measurement of the physical quantity.
(2) Verification of the physical quantity of the artefact must be conducted in an appropriate way, having regard to the nature of the artefact.
Division 2 Verification of artefacts
34B Application for verification of physical quantity of an artefact
(1) Application may be made for verification of a physical quantity of an artefact.
(2) The application must be:
(a) made in the form provided by the Chief Metrologist to verifying authorities for issue to applicants; and
(b) accompanied by the artefact; and
(c) given to a relevant verifying authority.
(3) The verifying authority may, by written notice, require the applicant to lodge with the authority any additional information the authority needs to consider the application properly.
(4) The verifying authority may refuse to proceed with the application until the applicant complies with the notice.
34C Verification of physical quantity of artefacts
(1) On application under regulation 34B, the verifying authority:
(a) may verify a physical quantity of the artefact; and
(b) if the physical quantity of the artefact is verified:
(i) must issue a certificate of verification to the applicant; and
(ii) may issue a copy of the certificate to anyone else the authority considers should be given a copy.
(2) The certificate of verification of a physical quantity of an artefact must state:
(a) the name and address of the verifying authority; and
(b) the date of the verification; and
(c) the result of the verification ascertained on the day of verification; and
(d) the accuracy with which the physical quantity of the artefact is verified; and
(e) the value (stating the uncertainty) of any relevant environmental or other influence factors, such as temperature or pressure, at the time of the verification; and
(f) a description of:
(i) any mark on, or attached to, the artefact; or
(ii) a sealed container attached to the artefact.
(3) For paragraph (2) (d), the accuracy of a verification of a physical quantity of an artefact is to be ascertained and expressed in a manner determined in writing by the Chief Metrologist.
(4) The verifying authority must not verify a physical quantity of an artefact unless the artefact bears an identifying mark.
34D Decision not to verify, or delay in verifying, physical quantity of artefact
(1) If the verifying authority decides not to verify a physical quantity of an artefact, the authority must give written notice of the reason to the applicant as soon as practicable.
(2) If the authority has not granted an application, or given notice to the applicant under subregulation (1), within 3 months after receiving the application, the authority must, at the request of the applicant, given written notice to the applicant of the reasons for the delay.
34E Marking of artefacts
(1) Before verifying a physical quantity of an artefact, the verifying authority must satisfy itself as to whether the artefact bears an identifying mark.
(2) If the artefact does not bear an identifying mark, the verifying authority must mark the artefact with an identifying mark.
(3) If:
(a) the artefact does not bear an identifying mark; and
(b) it is impracticable to mark the artefact with an identifying mark because of the nature, shape or size of the artefact;
the verifying authority must enclose an identifying mark in a sealed container and attach the sealed container to the artefact.
[11] Regulation 38, heading
substitute
38 Decision not to certify, or delay in certifying, measuring instruments
[12] Regulation 50, heading
substitute
50 Decision not to certify, or delay in certifying, reference material
[13] Regulation 62, heading
substitute
62 Decision not to approve, or delay in approving, patterns of measuring instrument
[14] Paragraph 73 (1) (a)
substitute
(a) in the opinion of the Chief Metrologist, is capable, or has direct control of staff who are capable, of:
(i) verifying a standard of measurement; or
(ii) verifying a physical quantity of an artefact; or
(iii) certifying a reference material; or
(iv) certifying a measuring instrument;
to which the application relates; or
[15] Paragraphs 74 (1) (a) to (c)
after
measurement
insert
and physical quantities of artefacts (if any)
[16] Subregulation 74 (2)
after
measurement
insert
or physical quantity of an artefact
[17] Subregulation 85 (1), table, after item 2
insert
2A | subregulation 34B (4) | not to verify an artefact until the applicant complies with a notice |
2B | subregulation 34C (1) | not to verify an artefact |
[18] Regulation 87
omit
Part VA
insert
Part IV
[19] Subparagraph 87 (d) (ii)
omit
Division 1 of Part 4 of Schedule 12.
insert
Schedule 1 to the National Trade Measurement Regulations 2009.
[20] Regulation 89
omit
[21] Regulation 90A
omit
[22] Schedule 12
substitute
Schedule 12 Maximum permissible error — legal measuring instruments
(regulation 3, definition of maximum permissible error)
When comparing the error of an evidential breath analyser with the corresponding maximum permissible error, the maximum permissible error must be rounded to the value of the verification scale interval. The error of a reading indicated by an evidential breath analyser may be greater than the maximum permissible error by one least significant digit.
Table 1 Evidential breath analysers
Item | Mass concentration | Maximum permissible error for certification | Maximum permissible error for recertification |
1 | Not more than 0.08 g/210 litres | 0.004 g/210 litres | 0.006 g/210 litres |
2 | More than 0.08 g/210 litres but not more than 0.4 g/210 litres inclusive | 5% of measured concentration | 8% of measured concentration |
3 | More than 0.4 g/210 litres | 20% of measured concentration | 30% of measured concentration |
[23] Schedule 13
substitute
Schedule 13 Fees
(regulation 90B)
Part 1 Examination and certification of volume measuring instruments
Table 1 Examination and certification of volume measuring instruments
Item | Activity code | Activity | Level 1 fee ($) | Level 2 fee ($) | Level 3 fee ($) |
1 | AP | Application processing | 291 | 291 | 291 |
2 | AA | Application assessment | 198/hour | 198/hour | 198/hour |
3 | IP | Instrument performance | 198/hour | 198/hour | 198/hour |
4 | TT | Temperature test | 1 182 | 1 955 | 2 091 |
5 | HU | Humidity test | 1 364 | 1 455 | 1 591 |
6 | VT | Voltage test | 591 | 800 | 891 |
7 | LB | Line‑borne interference test | 1 455 | 1 455 | 1 455 |
8 | SD | Static discharge test | 891 | 1 727 | 1 864 |
9 | EMS | Electromagnetic susceptibility test | 3 109 | 3 455 | 3 745 |
10 | ESS | Endurance | 582 | 1 182 | 1 455 |
11 | EXT | Extra or miscellaneous test | 191 | 564 | 800 |
12 | CHK | Checklist | 198/hour | 198/hour | 198/hour |
13 | SR | Summary report | 198/hour | 198/hour | 198/hour |
14 | CP | Certificate preparation | 198/hour | 198/hour | 198/hour |
15 | HRS | Consultations, performance and other tests | 198/hour | 198/hour | 198/hour |
Note Table 1 sets out three levels of fees that apply to the instruments described, respectively, by subparagraphs 90B (2) (a) (i), (3) (a) (i) and (4) (a) (i).
Part 2 Examination and certification of weighing and dimensional measuring instruments
Table 2 Examination and certification of weighing and dimensional measuring instruments
Item | Activity code | Activity | Level 1 fee ($) | Level 2 fee ($) | Level 3 fee ($) |
1 | AP | Application processing | 291 | 291 | 291 |
2 | AA | Application assessment | 198/hour | 198/hour | 198/hour |
3 | IP | Instrument performance | 198/hour | 198/hour | 198/hour |
4 | TT | Temperature test | 1 727 | 2 273 | 2 364 |
5 | HU | Humidity test | 936 | 1127 | 1500 |
6 | VT | Voltage test | 709 | 818 | 891 |
7 | LB | Line‑borne interference test | 655 | 755 | 936 |
8 | SD | Static discharge test | 655 | 755 | 845 |
9 | EMS | Electromagnetic susceptibility test | 3 318 | 3 745 | 4 218 |
10 | ESS | Endurance | 727 | 936 | 1 173 |
11 | EXT | Extra or miscellaneous test | 273 | 591 | 727 |
12 | CHK | Checklist | 198/hour | 198/hour | 198/hour |
13 | SR | Summary report | 198/hour | 198/hour | 198/hour |
14 | CP | Certificate preparation | 198/hour | 198/hour | 198/hour |
15 | HRS | Consultations, performance and other tests | 198/hour | 198/hour | 198/hour |
Note Table 2 sets out three levels of fees that apply to the instruments described, respectively, by subparagraphs 90B (2) (a) (ii), (3) (a) (ii) and (4) (a) (ii).
Part 3 Examination and certification of patterns of measuring instruments (including under mutual recognition agreements)
Table 3 Examination and certification of patterns of measuring instruments
Item | Activity code | Activity | Level 1 fee ($) | Level 2 fee ($) | Level 3 fee ($) |
1 | AP | Application processing | 291 | 291 | 291 |
2 | AA | Application assessment | 198/hour | 198/hour | 198/hour |
3 | SR | Summary report | 198/hour | 198/hour | 198/hour |
4 | EXT | Extra or miscellaneous test | 455 | 545 | 727 |
5 | CP | Certificate preparation | 198/hour | 198/hour | 198/hour |
6 | HRS | Consultations, performance and other tests | 198/hour | 198/hour | 198/hour |
Note Table 3 sets out three levels of fees that apply to the instruments described, respectively, by:
(a) paragraph 90B (2) (b) — the level 1 fee; and
(b) paragraph 90B (3) (b) — the level 2 fee; and
(c) paragraphs 90B (4) (b) and (c) and subregulation 90B (5) — the level 3 fee.
Part 4 Examination and certification of evidential breath analysers
Table 4 Examination and certification of evidential breath analysers
Item | Activity code | Activity | Fee ($) |
1 | AP | Application processing | 291 |
2 | AA | Application assessment | 198/hour |
3 | IP | Instrument performance | 198/hour |
4 | TT | Temperature test | 473 |
5 | HU | Humidity test | 473 |
6 | VT | Voltage test | 982 |
7 | LB | Line‑borne interference test | 2 273 |
8 | SD | Static discharge test | 1 964 |
9 | EMS | Electromagnetic susceptibility test | 21 500 |
10 | MS | Mechanical shock | 3rd party provider cost + 198/hour |
11 | ME | Magnetic effect | 3rd party provider cost + 198/hour |
12 | HC | Hydrocarbons | 3rd party provider cost + 198/hour |
13 | SF | Supply frequency | 3rd party provider cost + 198/hour |
14 | HTS | High temperature storage | 291 |
15 | DHC | Damp heat cyclic | 291 |
16 | DCP | DC power supply | 3rd party provider cost + 198/hour |
17 | DCR | Ripple on DC | 3rd party provider cost + 198 per hour |
18 | VIB | Vibration | 3rd party provider cost + 198/hour |
19 | DB | Durability | 3rd party provider cost + 198/hour |
20 | EXT | Extra or miscellaneous test | 727 |
21 | CHK | Checklist | 198/hour |
22 | SR | Summary report | 198/hour |
23 | CP | Certificate preparation | 198/hour |
24 | HRS | Consultations, performance and other tests | 198/hour |
Part 5 Examination and certification of grain protein measuring instruments
Table 5 Examination and certification of grain protein measuring instruments
Item | Activity code | Activity | Fee ($) |
1 | AP | Application processing | 291 |
2 | AA | Application assessment | 198/hour |
3 | IP | Instrument performance | 198/hour |
4 | TT | Temperature test | 4 118 |
5 | HU | Humidity test | 1 409 |
6 | VT | Voltage test | 755 |
7 | LB | Line‑borne interference test | 709 |
8 | SD | Static discharge test | 709 |
9 | EMS | Electromagnetic susceptibility test | 3 364 |
10 | EXT | Extra or miscellaneous test | 727 |
11 | CHK | Checklist | 198/hour |
12 | SR | Summary report | 198/hour |
13 | CP | Certificate preparation | 198/hour |
14 | HRS | Consultations, performance and other tests | 198/hour |
Part 6 Examination and certification of utility meters
Table 6 Examination and certification of utility meters
Item | Activity code | Activity | Fee ($) |
1 | AP | Application processing | 291 |
2 | AA | Application assessment | 198/hour |
3 | SR | Summary report | 198/hour |
4 | CP | Certificate preparation | 198/hour |
5 | HRS | Consultations, performance and other tests | 198/hour |
Part 7 Verification of utility meters used for trade
Table 7 Verification of utility meters used for trade
Item | Activity code | Activity | Fee ($) |
1 | VUM | Verification of utility meters | 1 000 |
Part 8 Additional fees for use of equipment in examination of instruments
Table 8 Additional fees for use of equipment in examination of instruments
Item | Activity code | Equipment used | Fee per hour ($) |
1 | LARLOA | Large load cell facility (capacity 600 kg to 50 000 kg) | 100 |
2 | SMALOA | Small load cell facility (capacity 50 kg to 500 kg) | 82 |
3 | LIQHYD | Liquid hydrocarbons test facility | 182 |
4 | LPG | Liquified petroleum gas test facility | 182 |
5 | CNG | Compressed natural gas test facility | 182 |
6 | TEMP | Temperature controlled chamber | 82 |
7 | HUM | Humidity test chamber | 100 |
8 | REL | Reliability testing equipment | 82 |
9 | LINBOR | Line‑borne interference test equipment | 82 |
10 | EMS | Electromagnetic susceptibility testing chamber | 236 |
11 | ESD | Electrostatic discharge test equipment | 82 |
12 | HRS | Labour for operation of test facilities | 198 |
(regulation 4)
[1] Regulation 3, after definition of artefact
insert
Australian certified reference material means a reference material certified under regulation 48.
[2] Further amendments — Australian certified reference material
The following provisions are amended by inserting ‘Australian’ before ‘certified reference material’:
paragraph 47 (1) (c)
subregulation 48 (7)
paragraphs 51 (3) (a) and (b)
subregulations 53 (1) and (2).
Note
1. All legislative instruments and compilations are registered on the Federal Register of Legislative Instruments kept under the Legislative Instruments Act 2003. See http://www.frli.gov.au.