Electricity Supply Fees Determination 20111
Administration Ordinance 1990 (Jervis Bay Territory)
I, STEPHEN CLAY, Acting Assistant Secretary, Territories East Branch, Department of Regional Australia, Regional Development and Local Government, make this Determination under subsection 3B (1) of the Administration Ordinance 1990.
Dated 29 June 2011
STEPHEN CLAY
Contents
1 Name of Determination
2 Commencement
3 Revocation
4 Definitions
5 Fees for supply of electricity
6 Fees — miscellaneous
7 11kV time‑of‑use demand supply
8 LV industrial supply
9 Period for payment
10 Non-payment of fees
11 Refund of security deposit
Schedule 1 Fees for supply of electricity
Part 1 Domestic supply
Part 2 Domestic supply controlled off-peak
Part 3 General supply
Part 4 General supply controlled off‑peak
Part 5 LV industrial supply
Part 6 11kV time‑of‑use demand supply
Schedule 2 Miscellaneous fees
Part 1 Connection of electricity supply — fees payable before connection
Part 2 Other fees
This Determination is the Electricity Supply Fees Determination 2011.
This Determination commences on 1 July 2011.
The Electricity Supply Fees Determination 2009 is revoked.
In this Determination:
billing period means each successive period during which a customer is billed for electricity consumed.
domestic supply means the supply in a controlled manner to a residence.
domestic supply controlled off-peak, for a domestic supply customer, means a supply that is periodically switched on and off for load control reasons by time switch controls located in the customer’s residence switchboard.
fee means a fee payable by a customer for electricity supply or another related service at the rate mentioned in this Determination for the supply or service.
general supply means a supply of electricity to a customer that is not:
(a) a domestic supply; or
(b) an 11kV time-of-use demand supply; or
(c) a LV industrial supply.
general supply controlled off-peak, for a general supply customer, means a supply that is periodically switched on and off for load control reasons by time switch controls located in the customer’s premises switchboard.
GST has the meaning given by section 195-1 of the A New Tax System (Goods and Services Tax) Act 1999.
new account supply connection fee means a fee associated with the work necessary to connect supply for a new customer.
off-peak period means a period that is not a peak period or a shoulder period.
peak period means:
(a) 7 am to 9 am on a week day; or
(b) 5 pm to 8 pm on a week day.
shoulder period means:
(a) 9 am to 5 pm on a week day; or
(b) 8 pm to 10 pm on a week day.
week day means a day that is not a Saturday or a Sunday.
5 Fees for supply of electricity
(1) The fees for supply of electricity are set out in:
(a) for domestic supply in a billing period — Part 1 of Schedule 1; and
(b) for domestic supply controlled off-peak in a billing period — Part 2 of Schedule 1; and
(c) for general supply in a billing period — Part 3 of Schedule 1; and
(d) for general supply controlled off-peak in a billing period — Part 4 of Schedule 1; and
(e) for LV industrial supply in a billing period — Part 5 of Schedule 1; and
(f) for an 11kV time‑of‑use demand supply — Part 6 of Schedule 1.
Note A general supply customer is normally a business customer who is not a domestic customer or a large industrial customer.
(2) If a customer is a pensioner, the fees for domestic supply are subject to a rebate of $0.397300 for each day, to be applied before the application of GST to the customer’s account.
(3) If a customer is dependent on life support or constant positive airway pressure respirators, the fees for domestic supply are subject to a rebate of $0.830000 for each day, to be applied before the application of GST to the customer’s account.
A fee for an item mentioned in Schedule 2 is the amount mentioned in Schedule 2 for the item.
7 11kV time‑of‑use demand supply
If a customer has a minimum use of 200 kVA of electricity per month, the customer may be connected to 11kV time-of-use demand supply.
A customer may be connected to a LV industrial supply of electricity if:
(a) the customer has consumed more than 160 000 kWh of electricity in a previous 12‑month period; and
(b) the customer requests low voltage industrial supply.
A fee for the supply of an item mentioned in Schedule 1 or 2, must be paid within 14 days of the day a bill is issued for the amount of the fee.
(1) The notice of disconnection delivery fee mentioned in item 5 of Part 2 of Schedule 2 is payable if a fee is not paid by a customer within 18 days after the expiry of the period mentioned in section 9.
(2) If a fee is not paid by a customer within 6 days after the delivery of a notice of disconnection, the supply of electricity to the customer may be disconnected and the combined disconnection/reconnection fee mentioned in item 1 or 2 of Part 2 of Schedule 2 is payable.
(3) If a supply of electricity is disconnected under subsection (2), the customer must not be reconnected until the customer pays the outstanding amount of the electricity fees and any fees payable under subsections (1) and (2).
(1) This section applies if:
(a) a customer has paid a security deposit for a supply of electricity; and
(b) the customer requests that the supply of electricity be disconnected; and
(c) the customer receives a final account for the supply of electricity.
(2) If the customer pays the final account in full, the Department will refund the security deposit in full to the customer.
(3) If the customer does not pay the final account in full, the Department will retain the amount owing on the final account and refund the balance of the security deposit to the customer.
Schedule 1 Fees for supply of electricity
Item | Description | Unit of supply | Fee ($) excluding GST | Fee ($) including GST |
1 | System access | Per day | 0.520000 | 0.572000 |
2 | First 1167 kWh for a 60‑day period | Per kWh | 0.189300 | 0.208230 |
3 | For the balance of all electricity supply | Per kWh | 0.209600 | 0.230560 |
Part 2 Domestic supply controlled off-peak
Item | Description | Unit of supply | Fee ($) excluding GST | Fee ($) including GST |
1 | Off-peak access for off-peak 1 | Per day | 0.040000 | 0.044000 |
2 | Off-peak 1 (up to 9 hours off-peak supply daily) | Per kWh | 0.063100 | 0.069410 |
3 | Off-peak access for off-peak 2 | Per day | 0.040000 | 0.044000 |
4 | Off-peak 2 (up to 18 hours off-peak supply daily) | Per kWh | 0.100300 | 0.110330 |
Item | Description | Unit of supply | Fee ($) excluding GST | Fee ($) including GST |
1 | System access | Per day | 0.640000 | 0.704000 |
2 | First 3506 kWh for a 60‑day period | Per kWh | 0.174800 | 0.192280 |
3 | For the balance of all electricity supply | Per kWh | 0.190500 | 0.209550 |
Part 4 General supply controlled off‑peak
Item | Description | Unit of supply | Fee ($) excluding GST | Fee ($) including GST |
1 | Off peak access for off-peak 1 | Per day | 0.040000 | 0.044000 |
2 | Off-peak 1 (up to 9 hours off-peak supply daily) | Per kWh | 0.063100 | 0.069410 |
3 | Off-peak access for off-peak 2 | Per day | 0.040000 | 0.044000 |
4 | Off-peak 2 (up to 18 hours off-peak supply daily) | Per kWh | 0.100300 | 0.110330 |
Item | Description | Unit of supply | Fee ($) excluding GST | Fee ($) including GST |
1 | For an LV industrial supply | Per kWh | 0.145748 | 0.160323 |
Part 6 11kV time‑of‑use demand supply
Item | Description | Unit of supply | Fee ($) excluding GST | Fee ($) including GST |
1 | Monthly fee | Per kVA | 8.748400 | 9.623200 |
2 | For electricity supply during a peak period | Per kWh | 0.149544 | 0.164498 |
3 | For electricity supply during a shoulder period | Per kWh | 0.140976 | 0.155074 |
4 | For electricity supply during an off-peak period | Per kWh | 0.056458 | 0.062104 |
Part 1 Connection of electricity supply — fees payable before connection
Item | Description | Fee ($) excluding GST | Fee ($) including GST |
1 | Security deposit —pensioner | 100.00 | Not applicable |
2 | Security deposit —customer other than a pensioner | 200.00 | Not applicable |
3 | New account supply connection fee | 60.00 | 66.00 |
Note GST does not apply to a security deposit mentioned in item 1 or 2, see GST Ruling 2006/2.
Item | Description | Fee ($) excluding GST | Fee ($) including GST |
1 | Combined disconnection/reconnection fee — at the meter board | 120.00 | 132.00 |
2 | Combined disconnection/reconnection fee — at the pole or distribution pillar | 450.00 | 495.00 |
3 | Meter test requested by a customer — charged per hour and minimum charge is for 1 hour. | 60.00 | 66.00 |
4 | Extraordinary meter reading due to no access | 60.00 | 66.00 |
5 | Notice of disconnection delivery fee | 12.73 | 14.00 |
6 | Customer requested change of off-peak pricing option in excess of once in a 12‑month period | 60.00 | 66.00 |
Note
1. All legislative instruments and compilations are registered on the Federal Register of Legislative Instruments kept under the Legislative Instruments Act 2003. See http://www.frli.gov.au.