Commonwealth Coat of Arms

Renewable Energy (Electricity) Amendment Regulation 2012 (No. 6)1

Select Legislative Instrument 2012 No. 182

I, QUENTIN BRYCE, Governor-General of the Commonwealth of Australia, acting with the advice of the Federal Executive Council, make the following regulation under the Renewable Energy (Electricity) Act 2000.

Dated 2 August 2012

QUENTIN BRYCE

Governor-General

By Her Excellency’s Command

GREG COMBET

Minister for Climate Change and Energy Efficiency

1 Name of regulation

  This regulation is the Renewable Energy (Electricity) Amendment Regulation 2012 (No. 6).

2 Commencement

  This regulation commences on the day after it is registered.

3 Amendment of Renewable Energy (Electricity) Regulations 2001

  Schedule 1 amends the Renewable Energy (Electricity) Regulations 2001.

Schedule 1 Amendments

(section 3)

 

[1] Paragraph 22X (1B) (b)

omit

2012.

insert

2012;

[2] After paragraph 22X (1B) (b)

insert

 (c) for an activity mentioned in Parts 45 and 46 of Schedule 6—before 30 September 2012.

[3] Schedule 6, subclause 658 (3)

substitute

 (3) For the production of coke oven coke, the electricity baseline for calculating the amount of a liable entity’s partial exemption is 0.0397 MWh per tonne of coke oven coke on a dry weight basis that:

 (a) meets the necessary requirements for use in the integrated iron and steel manufacturing process; and

 (b) is produced as part of carrying on the emissions-intensive trade-exposed activity; and

 (c) is not a relevant product for the emissions-intensive tradeexposed activity of production of coke oven coke.

[4] Schedule 6, paragraph 658 (4) (b)

omit

activity.

insert

activity; and

[5] Schedule 6, after paragraph 658 (4) (b)

insert

 (c) is not a relevant product for the emissions-intensive tradeexposed activity of production of lime.

[6] Schedule 6, after Part 44

insert

Part 45 Production of coke oven coke

Division 1 Production of coke oven coke

731 Production of coke oven coke

  The production of coke oven coke is the physical and chemical transformation (at a temperature higher than 900 °C) of coal into coke oven coke that:

 (a) has a coke strength after reaction (CSR) value of more than 50% for at least 80% of the coke oven coke produced; and

 (b) has a coke reactivity index (CRI) value of less than 40% for at least 80% of the coke oven coke produced.

Division 2 Classification of activity

732 Classification of activity

  The production of coke oven coke is a highly emissionsintensive activity.

Division 3 Electricity baseline for calculating partial exemption

733 Electricity baseline for product

  The electricity baseline for calculating the amount of a liable entity’s partial exemption in respect of the production of coke oven coke is 0.0109 MWh per tonne of coke oven coke on a dry weight basis that:

 (a) has a coke strength after reaction (CSR) value of more than 50% for at least 80% of the coke oven coke produced; and

 (b) has a coke reactivity index (CRI) value of less than 40% for at least 80% of the coke oven coke produced; and

 (c) is not a relevant product for the emissions-intensive tradeexposed activity of integrated iron and steel manufacturing; and

 (d) is produced by carrying on the emissions-intensive tradeexposed activity; and

 (e) is of saleable quality.

Note   Saleable quality is defined in regulation 22C.

Part 46 Production of hydrogen peroxide

Division 1 Production of hydrogen peroxide

734 Production of hydrogen peroxide

  The production of hydrogen peroxide is the chemical transformation of hydrogen (H) feedstocks and oxygen (O) feedstocks:

 (a) to produce crude aqueous hydrogen peroxide solution that has a concentration of hydrogen peroxide (H2O2(aq)) of at least 39% with respect to mass; and

 (b) to later produce saleable aqueous hydrogen peroxide solution that has a concentration of hydrogen peroxide (H2O2(aq)) of at least 34% with respect to mass.

Division 2 Classification of activity

735 Classification of activity

  The production of hydrogen peroxide is a moderately emissionsintensive activity.

Division 3 Electricity baseline for calculating partial exemption

736 Electricity baseline for product

  The electricity baseline for calculating the amount of a liable entity’s partial exemption in respect of the production of hydrogen peroxide is 0.858 MWh per tonne of 100% equivalent hydrogen peroxide in saleable aqueous hydrogen peroxide solution that:

 (a) has a concentration of hydrogen peroxide (H2O2(aq)) of at least 34% with respect to mass; and

 (b) is produced by carrying on the emissions-intensive tradeexposed activity; and

 (c) is of saleable quality.

Note   Saleable quality is defined in regulation 22C.

Note

1. All legislative instruments and compilations are registered on the Federal Register of Legislative Instruments kept under the Legislative Instruments Act 2003. See www.comlaw.gov.au.