Page

 

1 Purpose and application

2 Benefits of community engagement and risk communication

3 Key principles of community engagement and risk communication

4 A step-by-step guide to community engagement and risk communication

4.1 Planning and preparation

4.1.1 Identify the purpose of communication

4.1.2 Identify your target audience and undertake audience analysis

4.1.2.1 Audience analysis

4.1.3 Identify stakeholders

4.1.4 Risk perception

4.1.5 Develop the message

4.1.6 Determine requirements for engagement

4.1.7 Incorporate an evaluation process

4.1.8 Develop an engagement and communication protocol

4.1.9 Reporting on community engagement

4.2 Key messages for contaminated land practitioners

4.2.1 Community perceptions

4.2.2 Credibility is based on more than scientific and technical competence

4.2.3 Effective communication is necessary but not sufficient

4.2.4 Avoiding community engagement will guarantee trouble

4.2.5 Do not promise more than you can deliver

4.2.6 An unfair process will generate outrage

4.2.7 Effective communication must be a two-way process

4.2.8 Resolving disputes requires a dedicated process

4.2.9 Validate your messages and behaviour

4.2.10 Trust and credibility are both essential

5 Community engagement techniques

5.1 Engagement techniques: summary of advantages and disadvantages

5.2 Engagement and communication DOs and DON’Ts

6 Case studies

6.1 Case study 1: Radioactive site in metropolitan area

6.2 Case study 2: Ardeer, Victoria

Background

Community engagement and risk communication plan

Engagement techniques

Outcomes

7 Bibliography

8 Glossary

1                   Purpose and application

This Schedule provides a systematic approach to effective community engagement and risk communication in relation to the assessment of site contamination. It is not intended to be prescriptive but is intended to be used as a tool for effective engagement by consultants and regulators and should also provide a useful reference for all stakeholders including industry, government, landholders and the wider community. It should be noted that, in addition to this Schedule, each state or territory has its own regulatory requirements regarding notification of contamination/pollution to the appropriate regulatory agency.

 

There are three principles to the approach taken in the preparation of this Schedule:

As an indication, engagement with the community is likely to be particularly beneficial in the following situations:

 

amenity/nuisance when the assessment or decisions on and implementation of remediation strategies informed by the assessment of the site may affect the amenity of the locality, for example, by way of temporary noise, odour, emissions or dust

 

significant contamination where a high level of contamination has the potential to affect the adjacent community, or where the contaminant types are controversial

 

site proximity where the site is near to residential areas or particularly sensitive receptors and/or vulnerable sub-populations, such as childcare centres, schools or nursing homes, and sensitive ecological receptors

 

controversial sites where the site or locality has a controversial history that may be related to the site contamination, or the development of the site is controversial for political, economic or social reasons, or where the characteristics or toxicity of the contamination may be controversial, or where contamination has moved outside the site boundaries, or a remediation method may be proposed that is perceived as controversial or that is likely to affect the amenity of the locality or give rise to nuisance conditions.

2                   Benefits of community engagement and risk communication

When managed well, community engagement and risk communication can benefit the assessment and management of site contamination by helping site managers to:

Simply distributing information without regard for the complexities and uncertainties of the issues does not ensure effective engagement and risk communication. A well-developed community engagement plan will help ensure that messages and actions are constructively formulated, communicated and received.

 

Two-way engagement, which effectively conveys information and enables community participation in the decision-making process, can provide significant cost savings and improve credibility for organisations involved in site assessment. The community also benefits by contributing to: improved risk assessment inputs, increased ownership of negotiated decision processes, and more acceptable site-management options.

3                   Key principles of community engagement and risk communication

The United States Environmental Protection Agency (US EPA) has identified seven overarching principles which should guide risk communication as part of community engagement (US EPA 2007). Corvello et al. (1989) have adapted these seven principles, as follows:

 

Accept and involve the community as a legitimate partner

 

Plan carefully

 

Listen to the community’s specific concerns

 

Be honest, frank and open at all times

 

Coordinate and collaborate with other credible sources

 

Meet the needs of the community

 

Meet the needs of the media

 

Speak clearly and with compassion, kindness and respect

 

Evaluate effectiveness

4                   A step-by-step guide to community engagement and risk communication

A community engagement and risk communication plan is an integral part of the wider goal of successful assessment and management of site contamination. Effective communication relies on a commitment to planning, focusing the response to address community concerns and ongoing evaluation with the aim of continuous improvement. Engagement and communication goals should be quite specific, must be well understood by the consultant and should be communicated to the wider community at the beginning of, and during, any engagement plan.

 

A good plan should help you to:

Engagement should start as early as possible and continue throughout the site assessment. The community should be informed of possible risks as soon as an issue is identified that may pose a risk to health or the environment or raise public concern. This can mean starting the engagement process before all the information is known and before all options for managing the risk have been identified and considered.

 

The early initiation of the engagement process is often difficult for those responsible for the site, as they may be unused and unwilling to publicise possible risks associated with the site until they are sure what those risks may be and how they will be managed. However, by consulting early, the community is allowed to actively participate in the decision-making process and members will feel that they have some control over and involvement in the risk assessment and management process. When the community participates in a risk management decision, it is more likely to accept it.

 

For more complex or contentious sites, a better outcome is often achieved if the engagement and communication role is undertaken by a third party such as a consultant or professional facilitator. This can help to ensure a more open exchange of information and reduce tension if the community is already mistrustful of those responsible for the site assessment.

 

Open and honest information exchange between organisations (including government agencies) and the community is vital in the management of site contamination. Community members have a right to information about environmental factors that affect their lives and they can contribute valuable local knowledge to the decision-making processes. However, when engaging with the community, there are some legislative issues to consider that may limit or modify the information provided.

 

For example:

In planning communication, the first contact should be with the assessor’s organisational communication or liaison officer. Planning should also involve government agencies and emergency services (if necessary) to ensure that procedures are understood and that everyone involved agrees on roles and procedures.

 

A communication plan starts by answering the following questions:

It is essential to have a clear understanding of the purpose of communicating. Is it:

In order to manage expectations, the purpose of the communication activity should be made clear to the community, including the elements that have already been decided upon and are non-negotiable, and what aspects are open for discussion and decision.

Once the purpose of the communication has been identified, it is important to identify and analyse the target audience including for cultural and religious sensitivities. If communication efforts are aimed too broadly, the message may not reach key persons. The more tailored messages are to specific audiences, the more effective they will be. Audience analysis will also provide an insight as to what communication methods and tools will best reach each target audience. The communication plan should identify all of the stakeholdersincluding those beyond the affected community. This includes local and state officials and politicians, other agencies and organisations and, if relevant, emergency and health services.

 

Establish the project’s area of impact. Determining how far interest in the project extends, and determining the location of geographic boundaries and communities of interest will help identify who should be engaged in the engagement process.

 

Contact key community leaders. Crises tend to push forward local community leaders and groups who become active in voicing community concerns. Identify those people and groups and involve them early on in communication and decision-making activities. Also include council staff and local politicians to brief them about the impending project if appropriate. The longer a delay in involving community representatives and groups, the harder it can be to gain their support and trust. It might also be useful to obtain expert advice about the local community and any outstanding issues that may have an impact on the plan.

 

It is vital to consider community languages when planning communication activities. Where required, provide printed information in languages other than English. Translators may also be required for verbal communication activities.

 

There are also a number of protocols for effectively engaging Aboriginal and Torres Strait Islander people. These should be considered prior to initiating communication activities. It is, for example, essential to have an appreciation of cultural difference, to use accurate and non-offensive language, and to show respect when communicating with Aboriginal and Torres Strait Islander people and organisations. Most jurisdictions have guidelines or principles for building good communication skills and channels with Aboriginal and Torres Strait Islander people, communities and organisations. For further information, contact the relevant state or territory health and indigenous affairs departments.

 

In planning particular sessions or modes of communication, it is important to consider matters of wheelchair accessibility and the possible need for services for people with vision or hearing impairment.

There are a number of resources and sources of information available which are useful in audience analysis. The Australian Bureau of Statistics (ABS) website (www.abs.gov.au) has tools that enable the extracting and viewing of census data for specific geographical areas. This data can be used to build a demographic profile of the local community, including information about male-to-female ratios, number of children and elderly people, socio-economic status, level of educational attainment, minority groups and languages spoken at home. These factors should be carefully considered when planning any communication activity, and may also influence the audience’s perception of risk.

 

Other sources of information that may be helpful in building a profile of a community include:

The area of relevance to assessment of site contamination typically contains a variety of stakeholders, all of whom should be taken into consideration when planning communication activities. A general outline of the various stakeholders that may typically be involved in risk communication and engagement in relation to site contamination and assessment is discussed below. However, it should be remembered that even within these groups there may be a diverse range of perspectives, expectations and concerns, and each group may also be comprised of people of different cultural and socio-economic backgrounds.

 

Stakeholders include:

The term ‘risk perception generally refers to the perceptions of that part of the community that is outside the regulatory, scientific research and risk assessment spheres. In engaging with the community, it is important to remember that perception of risk can be influenced by numerous factors beyond just the scientific data. It is for this reason that what may scientifically constitute a ‘negligible risk’ can still give rise to anger and resentment within the community. People see risk as multidimensional and not as being represented by a numerical value alone, judging risk according to its characteristics and context. For example, trauma and death as the result of an involuntary catastrophic reaction is likely to be dreaded more than as the result of a situation where the risk is assumed voluntarily and the person feels some degree of control over it (for example, motor vehicle crashes).

 

A study by the Centre for Population Studies in Epidemiology, (Starr & Taylor 2000), investigated health risk perception in a national sample population. Major findings indicated that risk perception is largely influenced by age, gender and education, and that certain kinds of risks tend to arouse heightened levels of concern.

 

Concerns about risk tend to be heightened where risks are:

While medical doctors were viewed with greater trust, nearly 40% of study participants identified the media (including newspapers, magazines, television and radio) as their primary source of information.

It is often helpful to develop key messages as part of the risk communication planning process. This can help to focus communication activities on the most important information and, by helping to ensure that messages are consistent, can also assist in building trust with communities.

 

It is important to remember that message development is not ‘spin’ and is not manipulative, and nor is it a substitute for two-way communication. The key to good message development is to avoid bombarding the audience with too much information or with information that does not address their needs. This can be achieved by understanding community concerns and focusing messages on answering those concerns in a clear and concise manner.

 

In developing key messages, it is helpful to collate maps, diagrams and reports relevant to the project and identify data which may be useful in providing information, explaining decisions, and so on.

 

The most important part of message development is focusing on what information the community wants. In general, people are interested in receiving information on the following subjects:

As part of an engagement process, the following kinds of questions may be asked, relating to numerous types of concerns.

Note: these are generalisations and these questions are NOT provided as a substitute for identifying the community concerns through two-way communication.

 

Health and lifestyle concerns

 

Data and information concerns

 

Process concerns

 

Risk management concerns

In formulating key messages, it is often useful to convey information in more than one way, for example, to use visual representations of information in addition to just words. If you need to communicate numerical risk information it is also useful to consider the following techniques:

Consider expressing risks in terms of absolute risk (1 in 10) rather than relative risk (10%), and do not use decimals.

Following audience analysis and identification of stakeholders, requirements should be determined for engagement and stakeholder involvement including:

Plan to involve all parties in evaluation and feedback on the effectiveness of the engagement and communication throughout implementation of the community engagement plan, as well as after the conclusion of the process. This will allow for midcourse improvements to be made, where necessary. The effectiveness of a community engagement plan can be measured by evaluating the implementation of engagement techniques and actions, the quality and quantity of stakeholder interactions, and by reviewing stakeholder relationships.

This kind of public document should include the following information:

Following the implementation of a community engagement plan, reporting and subsequent feedback to the community should be undertaken, which should address the following:

The ten key take-home messages (adapted from Heath et al. 2010) for contaminated land practitioners in regards to community engagement are:

Risk, in the context of contaminated land, is an inherently predictive, multidimensional estimate that is useful in trying to prevent future harm from happening. Because predictions of risk inevitably rely on a mixture of evidence, assumptions and judgment, characterising any differing beliefs of the public about risk as being just ‘perception’ is guaranteed to undermine trust and mutual respect, if not create open conflict and further outrage.

Scientific competence is essential to establish credibility, but is by itself not sufficient to ensure trust. Openness, honesty and transparency are also necessary to demonstrate credibility and warrant trust. This includes a frank and honest approach to dealing with uncertainty, which is inevitable in any risk assessment. Denial of uncertainty (both knowledge uncertainty and uncertainty caused by variability) will eventually backfire and undermine credibility.

Scientific and technical evidence is often complex and difficult to understand. If an audience is presented with confusing information they can at best ignore it or at worst be angered by it. However, regardless of how carefully or compassionately it is presented, scientific or technical evidence is unlikely to have a constructive impact if the public is outraged.

There is no all-purpose, sure way to avoid problems simply by engaging communities. However, it is equally certain that failing to engage a community about an issue of concern will create problems that could be reduced, if not avoided, by effective community engagement.

Overly zealous claims (even if they are sincere) about what or how quickly something can be achieved will, when not achieved, cause disappointment that may boil over into distrust. It is better to be realistic from the outset. With the public engaged from the beginning, they can make the journey through a project with some sense of ownership and reality that can lead to tolerance of missed targets.

People who believe they are being treated unfairly, in a condescending manner, or being ignored altogether, will become aggrieved, possibly to the point of active opposition. It is extremely difficult to engage an outraged public in a constructive manner.

One-way communication is simply preaching or selling. Any risk communication process that lacks an effective means to listen to community concerns, a commitment to seriously seek to understand those concerns and respond to them will be dismissed by the community as merely public relations.

Because proponent objectives for dealing with contaminated land may not coincide with the objectives of other stakeholders, there is always potential for disputes that are unlikely to be resolved purely by communication. Because litigation is expensive and often ineffective, dedicated alternative dispute resolution methods, such as negotiation or meditation, should be pursued before disputes become unmanageable.

Everyone involved in a project will have associates, whether they are family members, friends or non-technical staff, who can offer perspectives on key issues that will not be based on, or limited to, narrow scientific and technical interpretation. Talk with them to remind yourself of the lay person's view.

Trust and credibility are closely related and interdependent. Credibility (being worthy of confidence) is usually necessary to establish trust, but credibility alone does not guarantee trust. Because we are all busy and we already have more things to think about than we have time for, we inevitably have to rely on the views of others for most of the things that we face in our lives. When we rely on the views of others rather than analysing a problem for ourselves firsthand, we are placing trust in others. In essence, trust often serves as a means for dealing with complexity that we have insufficient time to resolve for ourselves.

5                   Community engagement techniques

An effective community engagement plan includes all affected stakeholders and uses techniques that ensure that those who wish to participate in the engagement are able to do so. Achieving effective engagement with stakeholders relies on selecting methods of communication that will reach the target groups.

 

Determining the extent of engagement depends upon the nature and impact of the contaminants, the proximity of the community, and the particular stage of the assessment process. As a general guide, the more significant the impact of the contamination on the community, the more community participation is expected. It is important to recognise that there is no single stakeholder and that different techniques need to be used to reach different stakeholders. It is also important to recognise that a combination of one or more techniques may need to be used to effectively engage with a particular stakeholder. Moreover, engagement is most likely to be effective if it builds on or creates an ongoing relationship between various stakeholders.

 

The choice of techniques will depend on a number of factors including:

 

A description of a range of engagement techniques, and the advantages and disadvantages of each, is provided below.

 

Group techniques

Technique

Description and Guidelines

Advantages

Disadvantages

Public meetings

Usually more than 20 people, self-selection by advertised invitation, formalised proceedings aimed at presenting information to large audience, conducted at a time and location to suit most people, needs to be widely publicised.

Provides a forum for information dissemination and exchange with large numbers, may incorporate other techniques such as workshops, brings a wide range of people together.

Focused discussion on one issue is difficult, more articulate and better prepared members of the community may dominate, less vocal sections of the community may not express their views.

On-site meetings

Open-air community meetings held on-site or adjacent to the affected site to provide information, gauge interest and explain process and procedures.

Enables interested individuals to gain an understanding of the issues involved. Useful for site contamination as standing on the site can remove some aura of the unknown.

Accessibility to site not always possible (for example, for aged or disabled community members, or for safety concerns).

Search conference

Usually 2030 participants selected to be heterogeneous but sharing an interest, staged discussion aimed at identifying broad cross-section of views on a variety of issues, lasting a day, weekend or longer.

Can assist in the early stages of the engagement process to identify community characteristics and relevant issues, program devised with participants, future orientated, allows lengthy discussion to develop and refine ideas.

Large time commitment, may appear to be an elite group, participants may not have necessary information, may tend to result in ‘wish list’ of unrealistic future requirements.

Design meeting

Community members meet to work on maps, scale representations and photographs to gain better idea of the effect on their community of proposals and options, expert presenters may be required.

Allows community members to better express their views and visualise the impact of changes, enables consultant to understand how a proposal appears to the community.

Numbers of participants limited, limited technique if complete socio-economic and environmental impact to be determined.

Workshops

Participants are usually homogeneous in terms of skills and concerns, structured sessions aimed at encouraging open discussion between participants and producing proposals for solutions.

Provides opportunity for all stakeholders to contribute, a flexible technique that can be used at all stages of the engagement process, can provide a forum for testing alternatives, training opportunities, information gathering and dissemination, receiving feedback and refining input.

If the participants are specifically selected then the nature of this technique can result in it appearing exclusive, the specific workshops may restrict discussion and debate.

Seminars

A meeting where a particular subject is explored in depth for some length of time under expert guidance.

Opportunity for learning and information sharing, detailed discussion and inquiry can take place, all participants can question or contribute.

The ‘right’ expert may not be available, participants may not be adequately prepared, experts may dominate and inhibit discussion.

 

Individual techniques

Technique

Description and Guidelines

Advantages

Disadvantages

Individual discussion

Selected individuals consulted by telephone, meetings and doorknocking an area.

Provides a quick and efficient means of disseminating information and identifying a range of issues and views.

Provides limited opportunities for large numbers of community members to participate in the process, does not allow for broadscale exchange of ideas.

Submission

Oral or written submissions to enable people to register their ideas and concerns, open to the general community and usually undertaken in the early or later stages of engagement.

Political and institutional demonstration of commitment to open engagement, provides focus for groups to organise a basis from which to lobby, provides consultant with some information on viewpoints of key stakeholders.

Limited role as submissions are unlikely to draw response from minority groups in the community, only ‘organised’ and articulate stakeholders are likely to respond, the formality of hearings may intimidate some.

Survey

Structured questioning of community sample that statistically represents the whole population or sector, used to gather information about objective characteristics or attitudes of a community.

Provides data for analysis of characteristics of a community, and to document probable effects of a proposal and for gauging likely public reaction to a proposal.

Minimal discussion and no interaction between members of the community, respondents may be indifferent to the subject matter and require persuasion.

Open houses

Informal arrangement where tables or booths are manned by knowledgeable government staff or consultants who are able to discuss what individuals in the community want.

Sets up a comfortable discussion situation for staff and members of the public. Especially useful early in the process to establish rapport and explain complex processes.

Attendances may be low if distrust of the consultants and government by the public is already high.

Display and exhibitions

Means of disseminating information to the community, mobile or permanent exhibition, may be staffed for seeking response and giving detailed explanation.

Opportunity to inform and meet with the wider community who can speak directly to the consultants, opportunity to demonstrate commitment to engagement.

May be costly and ineffective, particularly if the community does not perceive the issues as being of high importance.

Observations

Means of gathering information and establishing contacts in a community.

Provides a thorough understanding of the community in preparation for engagement.

This technique is generally only suitable in the early information collection stage of engagement.

Information bulletins and brochures

Regular information bulletins and brochures distributed to households and/or made available to the community at key public outlets.

Provides ongoing information on the project.

Generic flyers may be perceived as junk mail and may be ignored.

Site office

Temporary accommodation for consultants in the area, provides information for the wider community, needs to be suitably located and staffed.

Provides consultants with a convenient base from which to work and establish contact in the area, satisfies some community needs for individual attention to their issues and concerns.

Does not involve interaction between members of the community and may be costly, has limited value in the overall engagement process if used alone.

Open door

Conducting periodic open days to invite interested people and complainants to visit the site.

Can shift community confidence in current and proposed operations, pinpoint particular problems and result in problems being address and resolved.

May not be possible for commercial confidentiality or occupational health, safety and welfare reasons.

Hotline

A telephone service to provide information and to record comments, concerns and suggestions.

Ensures that information is available; provides the opportunity for the wider community with mobility problems.

Would not reach all people from non-English speaking backgrounds unless hotline is available in different languages.

Websites

Information dissemination through an interactive web page, aimed at informing and generating interest.

Keeps the public and other interested parties informed. Can be updated quickly and easily. Allows people to access large amounts of information and provide feedback.

Can only be accessed by those with access to a computer with web connection. Tends not to be available to minority groups such as the elderly, poor, people with non-English speaking backgrounds. Can contribute to information overload if not managed effectively.

Use of media

Information dissemination through printed and electronic media, can be aimed at informing or generating interest and feedback.

Political and institutional advantages of ensuring that information is provided, keeps the community informed, provides opportunity for all of the community to contribute.

Will not reach all groups unless special attention is given to minority groups by the use of ethnic media, and other avenues to reach other target groups.

The above information was sourced and adapted from The human services planning kit, (SA Department of Housing and Urban Development 1994).

 

An extensive list of community engagement methods and techniques can also be found in Effective engagement: building relationships with community and other stakeholders, Book 3: the engagement toolkit, published by the Department of Sustainability and Environment Victoria (DSE VIC 2005) (www.dse.vic.gov.au/engage).

 

 

DO

DON’T

Abstractions

DO use examples, anecdotes and analogies to establish a common understanding

DON’T generalise too much or use hypothetical situations

Attacks

DO attack the issue

DON’T attack the person or organisation

Blame

DO take responsibility for your share of the problem

DON’T try to shift blame or responsibility to others

Clarity

DO ask whether you have made yourself clear

DON’T assume you have been understood

Guarantees

DO emphasise ongoing efforts and achievements made and explain any limitations on the guarantee and why they exist

DON’T say there are no guarantees

Humour

DO use humour wisely — if used, direct it at yourself

DON’T use humour in relation to safety, health or environmental issues

Jargon

DO define all technical terms and acronyms (e.g. NATA)

DON’T use language that may not be understood by your audience

Length of presentation

DO limit presentation to 15 mins to allow for longer question & answer periods

DON’T ramble or fail to plan the time well

Money

DO refer to the importance you attach to health, safety and environmental issues; your moral obligation to protect public health and the environment outweighs financial considerations

DON’T refer to the amount of money spent as if it proved your concern

Negative allegations

DO refute allegations

DON’T repeat or refer to them

Negative words and phrases

DO use positive or neutral terms

DON’T minimise or trivialise the risk

Non-verbal messages

DO be sensitive to non-verbal messages you are communicating; make them consistent with what you are saying

DON’T allow your body language, your position in the room, or your dress to be inconsistent with your message

’Off the record’

DO assume everything you say and do is part of the public record

DON’T make side comments or confidential remarks

Organisational identity

DO use personal pronouns (i.e. I, we)

DON’T take on the identity of a large organisation

Promises

DO promise only what you can deliver. Set and follow strict orders

DON’T make promises you can’t keep or fail to follow up

Reliance on words

DO use visuals to emphasise key points

DON’T rely entirely on words

Risk comparisons

DO use comparisons, when asked, to help put risks in perspective

DON’T compare unrelated risks

Speculations

DO provide information on what is being done

DON’T speculate about worst-case scenarios

Technical details and debates

DO base your remarks on empathy, competence, honesty and dedication

DON’T provide too much detail or take part in protracted technical debates

Temper

DO remain calm. Use a question or allegation as a springboard to say something positive

DON’T let your feelings interfere with your ability to communicate positively

 

6                   Case studies

Examples where effective community engagement practices were implemented early in the assessment of site contamination are provided below. Further case studies and examples of effective and ineffective engagement practices can be found in Heath et al. 2010.

Background

In 1997, a relatively undeveloped site in a metropolitan area was alleged to contain radioactive contamination. A site history and a radioactive survey were undertaken to assess the level of any immediate risks to public health. Following this, an engagement plan was developed prior to conducting a detailed site investigation.

Community engagement and risk communication plan

The following broad plan was formulated with the assistance of local government officers and elected members:

  • a consultation process, initially to inform targeted key members of the wider community prior to the detailed site assessment
  • following the site assessment, a wider engagement program with the local community to enable the community to contribute to decisions that could affect them.

Engagement and communication

The initial engagement involved informing and conducting meetings with:

  • identified community representatives
  • peak trade unions
  • elected members of local government
  • relevant government authorities and organisations.

Outcomes

The main outcomes of the initial engagement were that:

  • key members of the wider community were well informed about the contamination and the engagement process to be undertaken
  • these key stakeholders responded well and appeared satisfied that the issue was being managed in a logical and comprehensive manner
  • a level of trust and confidence in the consultants was established in the minds of the key stakeholders at the outset, which assisted further engagement with the community during the site assessment and remediation phases.

 

In 1989, severe lead contamination was confirmed in soil of a residential area in the Melbourne suburb of Ardeer. The site was used previously for secondary lead smelting and lead-acid battery manufacture. Measures were put in place to relocate residents of the severely affected properties and to assess contamination in the surrounding area. Accordingly, 19 properties had their soil remediated and ceiling dust was removed from 65 properties. The site assessment and the clean-up process necessitated engagement and communication with the residents.

Following the establishment of a broad snapshot of the local Ardeer community, the EPA developed an engagement plan. The engagement process extended over three and a half years, from initial assessment to completion of the remediation. The plan was based upon the following principles:

  • identifying the affected community
  • being clear about the purpose of conveying information
  • accepting the rights of the residents and groups to contribute to decisions that could affect them.

The EPA used various engagement techniques including:

  • doorknocking residents
  • discussions with principals and teachers of education establishments in proximity to the site
  • production and dissemination of ongoing multilingual information bulletins to the community in the area and the relevant action group
  • intensive contact and personal visits undertaken with those with contaminated properties
  • advising residents of sampling results
  • periodically issuing media releases.

The main outcomes of the process were that:

  • the community was well informed about the contamination and the remediation process
  • the local community was able to contribute to decisions that affected them
  • overall, the engagement plan was successful as the residents generally appeared satisfied that their safety was not compromised.

7                   Bibliography

ANZECC 1996, Polychlorinated Biphenyls Management Plan, Australian and New Zealand Environment and Conservation Council.

ASTM 2006, Standard E2348, Standard Guide for Framework for a Consensus-based Environmental Decision Making Process, ASTM International, West Conshohocken, PA, E2348-06, www.astm.org.

Blencowe, S 1992, ‘Remediation: level of disclosure and right to know’, Contaminated Land Remediation Technology Seminar: An International Perspective.

Bord, RJ & O’Connor, RF 1990, ‘Risk communication, knowledge and attitudes: explaining reactions to a technology perceived as risky’, Risk Analysis, vol. 10, no. 4.

Chun, A (Cptn) 1993, Human health risk assessment for contaminated sites: workshop, US Environmental Protection Agency, 8-10 November.

Chun, A (Cptn) 1997, Managing community outrage - risk communication for development projects: resource kit, US EPA & MFP Development Corporation, Adelaide, Australia.

Chess, C, Hance, BJ & Sandman, P 1989, Planning dialogue with communities: a risk communication workbook, Centre for Environmental Communication (CEC), Cook College, Rutgers University.

CEC 1994, Communicating with the public: ten questions environmental managers should ask, Centre for Environmental Communication, Cook College, Rutgers University.

City of Altona 1993, ‘Altona’s three community consultative committees’, 4th national environmental expo, 1993 municipal environment achievement awards, City of Altona.

Corvello, VT, McCallum, DB & Pavlova, MT (eds) 1989, Effective risk communication, Plenum Press, New York, pp. 4549.

enHealth 2006, Responding to environmental health incidents, community involvement handbook, enHealth Council, Melbourne NPHP.

Fischer, GW et al. 1991, ‘What risks are people concerned about?’ Risk Analysis, vol. II, no. 2.

Gardner, GT & Gould, LC 1989, ‘Public perceptions of the risks and benefits of technology’, Risk Analysis, vol. 9, no. 2, pp. 225.

Hadden, G 1991, ‘Institution Barriers to Risk Communications’ Risk Analysis, vol. II, no. 2, pp. 301.

Health Canada 2006, Improving Stakeholder Relationships: Public Involvement and the Federal Contaminated Sites Action Plan: A Guide for Site Managers, Minister of Public Works and Government Services Canada, Ottawa, Ontario.

Heath, L, Pollard, S, Hrudey, S & Smith, G 2010, Engaging the community: a handbook for professionals managing contaminated land, CRC for Contamination Assessment and Remediation of the Environment, Adelaide, Australia.

Harris, JS 1983, ‘Toxic uproar: a community history’, Journal of Public Health Policy, vol. 4, no. 2, pp. 189190.

International Association for Public Participation (IAP2) (2000) Code of Ethics for Public Participation Practitioners.

International Association for Public Participation (IAP2) Website http://www.iap2.org

Keeting, C, Hodgson, N & Reid, T (eds) 2003, Facilitation tool kit: a practical guide for working more effectively with people and groups, WA Department of Environmental Protection, Water and Rivers Commission and Department of Conservation and Land Management, Western Australia.

Kinke, A & Renn, O 2002, ‘A new approach to risk evaluation and management: risk based, precaution-based, and discourse-based strategies’, Risk Analysis vol. 22, no. 6, pp. 10701091.

Lundren, R & McMakin, A 2009, Risk communication: a handbook for communicating environmental, safety, and health risks, 4th edn, John Wiley & Sons, New Jersey.

McKersie, F, O’Brien, G & Royston, D 1992, ‘Siting a secure landfill: the community consultation factors’, Proceedings from 1st national hazardous and soil waste convention.

Meek, T (EPA) 1994, Effective community consultation, paper presented at the odour workshop, Clean Air Society of Australia & New Zealand, in cooperation with the Office of the South Australian Environment Protection Authority & the Institute of Public and Environmental Health Officers, August.

Meek, T 1996, Community right to know: community involvement in decision-making?, paper presented at the 13th International Clean Air Society of Australia & New Zealand conference, September.

Meek, T & Monahan, D (EPA) & Mival, K (Dames & Moore) 1994, Lead contamination on residential properties - assessment, clean-up and community aspects, paper presented at the 2nd National Hazardous & Solid Waste Convention & Trade Exhibition.

NAB & SWMG (2000), A Case Study of Problem Solving Through Effective Community Consultation, National Advisory Body (NAB) on Scheduled Wastes and Scheduled Wastes Management Group (SWMG), Canberra, Australia.

Otway, H & Wynne, B 1989, ‘Risk communication: paradigm and paradox’, Risk Analysis, vol. 9, no. 2, pp. 143.

PCB Consultation Panel 1995, Summary report of the PCB consultation panel on major outcomes from PCB public consultation, April.

Rust PPK Pty Ltd 1995, Community, industry and government partnerships: a review of consultation processes, June.

SA DHUD 1994, Human services planning kit, South Australian Urban Land Trust, Department of Housing and Urban Development, Adelaide, Australia.

SAHC 1991, The health risk assessment and management of contaminated sites, South Australian Health Commission, Adelaide, Australia.

Sandman, PM 1989, ‘Hazard versus outrage in the public perceptions of risk’, in Corvello, VT, DB McCallum, DB & Pavlova, MT (eds), Effective risk communication, Plenum Press, New York, pp. 45–49.

Scottish Environment Protection Agency 2010, Communicating Understanding of Contaminated Land Risks, Project UKLQ13, Scotland and Northern Ireland Forum for Environmental Research (SNIFFER), Edinburgh.

Starr, G, Langley, A & Taylor, A 2000, Environmental Health Risk Perception in Australia: A Research Report to the Commonwealth Department of Health and Aged Care, Adelaide: Centre for Population Studies in Epidemiology, Department of Human Services.

US EPA 1993, Ecological risk assessment for contaminated sites, workshop, 11 November.

US EPA 2007, Risk communication in action: the risk communication workbook, EPA/625/R-05/003, National Research Programs, United States Environmental Protection Agency, Washington, DC, USA.

US EPA 2007, Risk communication in action: the tools of message mapping, EPA/625/R-06/012, National Research Programs, United States Environmental Protection Agency, Washington, DC, USA.

VIC DSE 2005, Effective engagement: building relationships with community and other stakeholders, Book 1, An introduction to engagement, Department of Sustainability and Environment, Victoria, available online at http://www.dse.vic.gov.au/engage.

VIC DSE 2005, Effective engagement: building relationships with community and other stakeholders, Book 2, The engagement planning workbook, Department of Sustainability and Environment, Victoria, available online at http://www.dse.vic.gov.au/engage.

VIC DSE 2005, Effective engagement: building relationships with community and other stakeholders, Book 3, The engagement toolkit, Department of Sustainability and Environment, Victoria, available online at http://www.dse.vic.gov.au/engage.

WA DEC 2006, Contaminated Sites Management Series: Community Consultation Guideline, Western Australia Department of Environment and Conservation, Perth, WA.

WA DoE 2003, Community involvement, framework, Western Australian Department of Environment, Perth, WA.

 

 

8                   Glossary

Community engagement is the process of communicating and deliberating with the community and other stakeholders. It can include a variety of project-specific approaches:

Inform

one-way communication or delivery of information

Consult

providing for ongoing public feedback

Involve

a two-way process to ensure community concerns are considered as part of the decision-making process

Collaborate

developing partnerships with the community to make recommendations

Empower

allowing the community to make decisions and to implement and manage change.

Community means those individuals and/or groups residing in the locality where a site assessment is to be conducted and who may be affected by the assessment and/or possible site contamination physically (for example, through risks to health or the environment, loss of amenity) or non-physically (for example, via concern about possible contamination).

Contamination means the condition of land or water where any chemical substance or waste has been added as a direct result or indirect result of human activity at above background level and represents, or potentially represents, an adverse health or environmental impact.

EPA means the relevant environment protection authority or equivalent agency responsible for the regulation and management of contaminated land.

Exposure occurs when a chemical, physical or biological agent makes contact with the human body through breathing, skin contact or ingestion; for example, contaminants in soil, water and air.

Hazard is the intrinsic capacity of a chemical, biological, physical or social agent to produce a particular type of adverse health or ecological effect.

Community engagement consultant means an appropriately skilled professional employed to develop and implement the community engagement and risk communication plan.

Remediation means the clean-up or mitigation of pollution or of contamination of soil or water by various methods.

Risk assessment means the process of estimating the potential impact of a chemical, physical, microbiological or social hazard on a specified human population or ecosystem under a specific set of conditions within a certain timeframe.

Risk communication means an interactive process involving the exchange among individuals, groups and institutions of information and expert opinion about the nature, severity and acceptability of risks and the decisions to be taken to combat them. Risk communication is delivered most efficiently in the context of a well-structured community engagement process.

Risk management means the decision-making process to analyse and compare the range of options for site management and select the appropriate response to a potential health or environmental hazard. It may involve considerations of political, social, economic, environmental and engineering factors.

Risk means the probability in a certain timeframe that an adverse outcome will occur in a person, group, or ecological system that is exposed to a particular dose or concentration of a hazardous agent; that is, it depends on both the level of toxicity of hazardous agent and the level of exposure.

Risk perception is the subjective judgment that people make about the characteristics and severity of a risk.

Site managers are those responsible for environmental site assessment, risk assessment and risk management and may include landowners, contaminated land consultants, contractors or environmental auditors.

Site means the parcel of land being assessed for contamination.

Stakeholder means one who has an interest in a project or who may be affected by it.

Sustainable development means development that meets the needs of the present without compromising the ability of future generations to meet their own needs.

Wider community means individuals and/or groups, not necessarily residing in the locality of a site assessment, who may have an interest in the assessment.