Carbon Credits (Carbon Farming Initiative—Alternative Waste Treatment) Methodology Determination 2015
I, Greg Hunt, Minister for the Environment, make the following determination.
Greg Hunt
Minister for the Environment
Contents
1 Name of determination
2 Commencement
3 Authority
4 Duration
5 Definitions
6 Meaning of eligible CFI waste
7 Meaning of separated at the point of generation
8 References to factors and parameters from external sources
Part 2—Alternative waste treatment projects
9 Alternative waste treatment projects
Part 3—Project requirements
10 Operation of this Part
11 Requirements for a new project
12 Requirements for an expansion project
13 Requirements for a transitioning project
Part 4—Net abatement amount
Division 1—Preliminary
14 Operation of this Part
15 Overview of gases accounted for in abatement calculations
Division 2—Method for calculating net abatement amount
16 Summary
17 Net abatement amount
Division 3—Method for calculating activity abatement portions
Subdivision A—Activity abatement portions
18 Summary
19 Calculation and accrual of activity abatement portions
20 Activity abatement portions for certain transitioning projects
Subdivision B—Calculations relating to baseline emissions
21 Summary
22 Baseline emissions
23 Methane generation potential of degradable organic carbon content in eligible waste
24 Quantity of a waste mix type in eligible waste
25 Quantity of putrescible eligible waste
26 Total quantity of eligible waste received
27 Historic quantity of putrescible eligible waste
Subdivision C—Calculations relating to project emissions
28 Summary
29 Project emissions
30 Emissions from fuel
31 Emissions from purchased electricity
32 Emissions from the processing of eligible waste
33 Total quantity of putrescible waste
34 Emissions from composting processes
35 Emissions from anaerobic digesters
36 Volume of methane sent to a combustion device
37 Volume of methane vented due to a major venting event
38 Emissions from combustion devices
Division 4—Method for calculating legacy abatement portions
39 Summary
40 Timing of calculation
41 Calculation and accrual of legacy abatement portions
Part 5—Reporting, record‑keeping and monitoring requirements
Division 1—Offsets report requirements
42 Operation of this Division
43 Determination of certain factors and parameters
Division 2—Monitoring requirements
44 Operation of this Division
45 Requirements to monitor certain parameters
46 Consequences of not meeting requirement to monitor certain parameters
This determination is the Carbon Credits (Carbon Farming Initiative—Alternative Waste Treatment) Methodology Determination 2015.
This determination commences on the day after it is registered.
This determination is made under subsection 106(1) of the Carbon Credits (Carbon Farming Initiative) Act 2011.
This determination remains in force for the period that:
(a) begins when this determination commences; and
(b) ends on the day before this determination would otherwise be repealed under subsection 50(1) of the Legislative Instruments Act 2003.
In this determination:
Act means the Carbon Credits (Carbon Farming Initiative) Act 2011.
alternative waste treatment facility or AWT facility means a facility that:
(a) accepts and processes mixed solid waste using eligible waste treatment technology; and
(b) extracts recyclable materials from the waste.
alternative waste treatment project or AWT project has the meaning given by subsection 9(2).
anaerobic digester means a system that consists of:
(a) one or more closed units designed to promote anaerobic digestion; and
(b) a biogas collection system; and
(c) any equipment associated with the transfer of biogas to a combustion device.
Note: Examples of anaerobic digesters include the following:
(a) covered anaerobic lagoons;
(b) plug‑flow reactors;
(c) continuously stirred tank reactors;
(d) fixed film digesters;
(e) upflow anaerobic sludge blanket digesters.
anaerobic digestion means a biological process in which organic matter is broken down by microorganisms in the absence of oxygen.
applicable equation has the meaning given by subsection 41(4).
appropriate evidence has the meaning given by subsection 27(4).
appropriate measuring requirements has the meaning given by subsection 45(4).
biobased product means a product that:
(a) is manufactured by an AWT facility; and
(b) contains material that was previously putrescible eligible waste.
Note: Examples of biobased products include the following:
(a) compost;
(b) landscape mulch;
(c) mine site remediation material;
(d) soil conditioner.
biofilter means an engineered system that contains living compost‑like material through which biogas passes for methane oxidation.
biogas collection efficiency means the percentage of biogas generated in an anaerobic digester that is sent to a combustion device.
biosolids means a mixture of mainly water and organic materials that:
(a) is produced entirely from domestic or commercial waste water treatment processes; and
(b) has undergone further processing to significantly reduce disease‑causing pathogens and volatile organic matter; and
(c) has been stabilised for beneficial use.
CFI AWT determination means the following methodology determinations as in force immediately before the ERF commencement day:
(a) the Carbon Credits (Carbon Farming Initiative) (Avoided Emissions from Diverting Legacy Waste from Landfill for Process Engineered Fuel Manufacture) Methodology Determination 2012;
(b) the Carbon Credits (Carbon Farming Initiative) (Avoided Emissions from Diverting Legacy Waste through a Composting Alternative Waste Technology) Methodology Determination 2013;
(c) the Carbon Credits (Carbon Farming Initiative) (Diversion of Legacy Waste to an Alternative Waste Treatment Facility) Methodology Determination 2013;
(d) the Carbon Credits (Carbon Farming Initiative) (Enclosed Mechanical Processing and Composting Alternative Waste Treatment) Methodology Determination 2013.
combustion device means:
(a) a boiler, or an internal combustion engine, that is operated in accordance with the manufacturer’s instructions; or
(b) a flare that has a monitoring and control system and is operated in accordance with the manufacturer’s instructions; or
(c) a device:
(i) that combusts biogas with a destruction efficiency of at least 98%; and
(ii) that is operated in accordance with the manufacturer’s instructions; and
(iii) the combustion process of which is controlled using a monitoring and control system.
commercial and industrial waste means waste generated from fixed point sources related to manufacturing, wholesale, retail, professional services and administration sectors.
composting process means a biological process in which organic matter in solid waste is broken down by microorganisms in the presence of oxygen.
construction and demolition waste means waste generated from construction and demolition activities.
eligible CFI waste has the meaning given by section 6.
eligible waste means:
(a) for a transitioning project—eligible CFI waste that is processed by the project on or after the ERF commencement day; or
(b) for any other AWT project—mixed solid waste.
eligible waste treatment technology means the following:
(a) enclosed composting technology;
(b) one or more anaerobic digesters and the transfer of biogas to a combustion device for destruction;
(c) process engineered fuel manufacture.
enclosed composting technology:
(a) means a semi‑enclosed, or fully enclosed, alternative waste or composting technology in which the composting process occurs within a reactor that:
(i) has hard walls or doors on all 4 sides, or uses engineered soft covers; and
(ii) sits on a floor; and
(iii) has a permanent positive or negative aeration system; and
(b) may include open windrow composting to further refine compost products after the composting process mentioned in paragraph (a) is completed.
Note: Examples of enclosed composting technology include the following:
(a) composting tunnels;
(b) composting digesters;
(c) composting maturation halls.
ERF commencement day means the day Schedule 1 to the Carbon Farming Initiative Amendment Act 2014 commences.
Note: Schedule 1 to the Carbon Farming Initiative Amendment Act 2014 commenced on 13 December 2014.
expansion project has the meaning given by subsection 12(1).
first reporting period, for a project, means the first reporting period during which this determination is the applicable methodology determination for the project.
major venting event: a major venting event occurs when biogas in the storage capacity of an anaerobic digester is released to the atmosphere in a way that does not represent the proper operation of the anaerobic digester, including:
(a) when the biogas is released intentionally (for example, for safety or maintenance purposes); and
(b) when the biogas is released unintentionally (for example, as a result of a system failure).
mixed solid waste means municipal solid waste, commercial and industrial waste or construction and demolition waste but does not include any of the following:
(a) recyclable paper, paperboard, glass, metal or plastic that is separated at the point of generation;
(b) green waste or wood waste that is separated at the point of generation;
(c) organic waste from the livestock industry, such as straw bedding and manure mixes;
(d) biosolids;
(e) waste that is comprised of only putrescible waste that is separated at the point of generation.
monitoring and control system, for a flare or other device, means a system that consists of:
(a) a monitoring system that detects combustion and monitors if the combustion is operating at the manufacturer’s specifications for the complete combustion of methane; and
(b) an associated control system that shuts down biogas flow to the flare or other device when the flare or device is not operating at the manufacturer’s specifications for the complete combustion of methane.
Note: An example of a monitoring and control system for a flare is a flare management system that incorporates a UV detection sensor.
monitoring requirements means the requirements set out in section 45.
municipal solid waste means waste that is:
(a) generated from the domestic sector; and
(b) collected in household garbage, recycling, mixed organics, garden organics or local government clean‑up collections; and
(c) from 1 July 2015, classified as either municipal solid waste class I or municipal solid waste class II (within the meaning of the NGER (Measurement) Determination).
new project has the meaning given by section 11.
NGA Factors document has the meaning given by subsection 31(4).
NGER (Measurement) Determination means the National Greenhouse and Energy Reporting (Measurement) Determination 2008.
NGER Regulations means the National Greenhouse and Energy Reporting Regulations 2008.
non‑biobased product means a product manufactured by an AWT facility that is not a biobased product.
Note: Examples of non‑biobased products include the following:
(a) recycled steel;
(b) aluminium;
(c) plastic.
non‑monitored period has the meaning given by subsection 46(1).
open windrow composting means composting in which open air windrows are regularly turned to provide additional conditioning of the compost as required.
process engineered fuel manufacture means a process:
(a) by which a combustible fuel substitute is produced from mixed solid waste that would otherwise enter landfill; and
(b) that may include pre‑sorting of waste, separation of recyclable material, size reduction and screening.
putrescible eligible waste means the organic matter contained within eligible waste which is capable of being decomposed by microorganisms.
putrescible waste means the organic matter contained within solid waste which is capable of being decomposed by microorganisms.
relevant 24‑month period has the meaning given by subsection 27(4).
relevant day has the meaning given by subsection 31(4).
residual waste means material that:
(a) is disposed of in landfill at the end of processing by an AWT facility; and
(b) is not a biobased product, or a non‑biobased product, manufactured by the AWT facility.
separated at the point of generation has the meaning given by section 7.
transitioning project has the meaning given by section 13.
waste mix type means any of the following:
(a) food;
(b) paper and paper board;
(c) textiles;
(d) garden and park;
(e) wood and wood waste;
(f) sludge;
(g) nappies;
(h) rubber and leather;
(i) inert waste (including concrete, metal, plastic and glass).
6 Meaning of eligible CFI waste
(1) Waste of a particular kind is eligible CFI waste for a transitioning project if, under the CFI AWT determination that was the applicable methodology determination for the project immediately before the ERF commencement day, processing waste of that kind was a requirement to be an eligible offsets project.
(2) For the purposes of subsection (1), disregard any requirement in the CFI AWT determination that the waste processed must be legacy waste (as defined in the CFI AWT determination).
7 Meaning of separated at the point of generation
Waste is separated at the point of generation if:
(a) the waste is disposed of into a container, located where the waste is generated, that is intended to contain:
(i) a particular waste mix type; or
(ii) a particular combination of waste mix types; and
(b) the waste is of a waste mix type that the container is intended to contain.
Note: Examples of a container intended to contain a particular combination of waste mix types include:
(a) a container for co‑mingled recycling (that is intended to contain a combination of paper, glass, metal and plastics for recycling); and
(b) a container for mixed organics (that is intended to contain a combination of food and green waste for composting).
8 References to factors and parameters from external sources
(1) If a calculation in this determination includes a factor or parameter that is defined or calculated by reference to another instrument or writing, the factor or parameter to be used for a reporting period is the factor or parameter referred to in, or calculated by reference to, the instrument or writing as in force at the end of the reporting period.
(2) Subsection (1) does not apply if:
(a) the determination specifies otherwise; or
(b) it is not possible to define or calculate the factor or parameter by reference to the instrument or writing as in force at the end of the reporting period.
Part 2—Alternative waste treatment projects
9 Alternative waste treatment projects
(1) For paragraph 106(1)(a) of the Act, this determination applies to an offsets project that involves:
(a) the diversion of eligible waste that would otherwise enter landfill to an AWT facility; and
(b) the processing of that waste using eligible waste treatment technology.
(2) A project covered by subsection (1) is an alternative waste treatment project or AWT project.
(3) An AWT project may be:
(a) a new project; or
(b) an expansion project; or
(c) a transitioning project.
For paragraph 106(1)(b) of the Act, this Part sets out requirements that must be met for an AWT project to be an eligible offsets project.
11 Requirements for a new project
A new project must:
(a) construct a new AWT facility; and
(b) then process eligible waste, that would otherwise enter landfill, at the facility using eligible waste treatment technology.
12 Requirements for an expansion project
(1) An expansion project must:
(a) expand an existing AWT facility in order to increase the facility’s capacity to process eligible waste, that would otherwise enter landfill, using eligible waste treatment technology; and
(b) then process eligible waste, that would otherwise enter landfill, at the expanded facility using eligible waste treatment technology.
(2) An application made under section 22 of the Act in relation to an expansion project must be accompanied by appropriate evidence that is sufficient to calculate, using equation 8, the historic quantity of putrescible eligible waste processed by the existing AWT facility in the 24‑month period before the application is made.
Note: An expansion project that does not have evidence for the whole of the 24‑month period will not meet the requirements to be an eligible offsets project.
13 Requirements for a transitioning project
A transitioning project must:
(a) immediately before the ERF commencement day, be an eligible offsets project covered by a CFI AWT determination; and
(b) involve eligible waste, that would otherwise enter landfill, being processed using eligible waste treatment technology.
For paragraph 106(1)(c) of the Act, this Part specifies the method for working out the carbon dioxide equivalent net abatement amount for a reporting period for an AWT project that is an eligible offsets project.
15 Overview of gases accounted for in abatement calculations
The following table provides an overview of the greenhouse gases and emissions sources that are relevant to working out the carbon dioxide equivalent net abatement amount for an AWT project.
Greenhouse gases and emissions sources | |||
Item | Relevant calculation | Emissions source | Greenhouse gas |
1 | Baseline emissions | The decomposition of eligible waste at landfill | Methane (CH4) |
2 | Project emissions | Fuel consumption | Carbon dioxide (CO2) Methane (CH4) Nitrous oxide (N2O) |
3 | Project emissions | Electricity consumption | Carbon dioxide (CO2) Methane (CH4) Nitrous oxide (N2O) |
4 | Project emissions | Emissions from composting processes | Methane (CH4) Nitrous oxide (N2O) |
5 | Project emissions | Emissions from anaerobic digester leakage or venting events | Methane (CH4) Nitrous oxide (N2O) |
6 | Project emissions | Emissions from the combustion of biogas | Methane (CH4) Nitrous oxide (N2O) |
Division 2—Method for calculating net abatement amount
The carbon dioxide equivalent net abatement amount for a reporting period is worked out by adding together the activity abatement portion for the reporting period and any activity abatement portions, and legacy abatement portions, from previous reporting periods that have accrued and have not already been used to calculate the carbon dioxide equivalent net abatement amount.
The carbon dioxide equivalent net abatement amount for a reporting period, in tonnes CO2‑e, is worked out using the formula (equation 1):
where:
AN means the carbon dioxide equivalent net abatement amount for the reporting period, in tonnes CO2‑e.
A0 means activity abatement portion A0 for the reporting period, in tonnes CO2‑e, worked out in accordance with section 19.
AAcc means the amount, in tonnes CO2‑e, that is the sum of:
(a) each activity abatement portion that:
(i) has accrued from a previous reporting period (see subsection 19(3)); and
(ii) has not been used before to calculate the carbon dioxide equivalent net abatement amount; and
(b) if the project is a transitioning project—each legacy abatement portion that:
(i) has accrued from a previous reporting period (see subsection 41(2)); and
(ii) has not been used before to calculate the carbon dioxide equivalent net abatement amount.
Note: The no double counting test in section 15A of the Act means that abatement will only be reflected in the unit entitlement for a certificate of entitlement in respect of an eligible offsets project if it has not been reflected in the unit entitlement for another certificate or project.
Division 3—Method for calculating activity abatement portions
Subdivision A—Activity abatement portions
The activity abatement portions for a reporting period are worked out by dividing into 7 equal portions the abatement resulting from the project’s activities during the reporting period. One portion is used to calculate the carbon dioxide equivalent net abatement amount for the reporting period and the 6 other portions accrue over time to be used in subsequent reporting periods.
19 Calculation and accrual of activity abatement portions
Calculation of activity abatement portions
(1) Subject to subsection (2) and section 20, the activity abatement portions for a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 2):
where:
AY means activity abatement portion A0, A1, A2, A3, A4, A5 or A6, in tonnes CO2‑e.
EB means the baseline emissions, in tonnes CO2‑e, worked out using equation 3.
EP means the project emissions, in tonnes CO2‑e, worked out using equation 9.
Note: The result of subtracting EP from EB is divided by 7 because this is the length of the crediting period for emissions avoidance projects (see section 69 of the Act).
(2) The activity abatement portions for the reporting period are taken to be zero if:
(a) the quantity of putrescible eligible waste that is processed during the reporting period is, or is taken to be, zero; or
(b) the reporting period is not included in a crediting period for the project.
Note: The quantity of putrescible eligible waste that is processed during a reporting period is worked out using equation 6.
Accrual of activity abatement portions
(3) The activity abatement portions for a reporting period accrue as follows:
(a) A1 accrues 1 year after the end of the reporting period;
(b) A2 accrues 2 years after the end of the reporting period;
(c) A3 accrues 3 years after the end of the reporting period;
(d) A4 accrues 4 years after the end of the reporting period;
(e) A5 accrues 5 years after the end of the reporting period;
(f) A6 accrues 6 years after the end of the reporting period.
20 Activity abatement portions for certain transitioning projects
If the ERF commencement day falls within the first reporting period for a transitioning project, the activity abatement portions for the reporting period are to be worked out as if the reporting period started on the ERF commencement day.
Note: Waste that is processed by a transitioning project before the ERF commencement day is not eligible waste (see the definition of eligible waste in section 5).
Subdivision B—Calculations relating to baseline emissions
The baseline emissions for a reporting period are the emissions that would have resulted if the eligible waste processed during the reporting period had entered landfill instead.
(1) The baseline emissions for a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 3):
where:
EB means the baseline emissions, in tonnes CO2‑e.
WLFG means the average capture rate set out in the table in subsection (2) for methane emissions from landfill in the State or Territory in which the project is located.
MB means the methane generation potential of the degradable organic carbon content in eligible waste processed during the reporting period, in tonnes CH4, worked out using equation 4.
OFLF means the oxidation factor for near surface methane in landfill mentioned in subsection 5.4(1) of the NGER (Measurement) Determination.
GWPCH4 means the value specified as the Global Warming Potential for methane in regulation 2.02 of the NGER Regulations.
(2) The following table sets out the average capture rate for methane emissions from landfill in each State and Territory.
Average capture rate for methane emissions from landfill (WLFG) | |||
Item | State or Territory | Rate for transitioning projects (%) | Rate for other AWT projects (%) |
1 | New South Wales | 24 | 37 |
2 | Victoria | 32 | 45 |
3 | Queensland | 16 | 30 |
4 | Western Australia | 27 | 30 |
5 | South Australia | 29 | 29 |
6 | Tasmania | 33 | 39 |
7 | Australian Capital Territory | 47 | 66 |
8 | Northern Territory | 25 | 18 |
23 Methane generation potential of degradable organic carbon content in eligible waste
The methane generation potential of the degradable organic carbon content in eligible waste processed during a reporting period, in tonnes CH4, is worked out using the formula (equation 4):
where:
MB means the methane generation potential of the degradable organic carbon content in eligible waste processed during the reporting period, in tonnes CH4.
WMw means the quantity of waste mix type w present in the eligible waste, in tonnes, worked out using equation 5.
DOCw means the degradable organic carbon value for waste mix type w mentioned in section 5.12 of the NGER (Measurement) Determination.
DOCF,w means the fraction of degradable organic carbon dissimilated for waste mix type w mentioned in section 5.14A of the NGER (Measurement) Determination.
MCF means the methane correction factor for aerobic decomposition mentioned in section 5.14B of the NGER (Measurement) Determination.
WLFG,CH4 means the fraction, by volume of methane generated in landfill gas, mentioned in section 5.14C of the NGER (Measurement) Determination.
FC→CH4 means 1.336, being the factor to convert a mass of carbon to a mass of methane.
w means a waste mix type present in the eligible waste.
24 Quantity of a waste mix type in eligible waste
(1) The quantity of a waste mix type present in eligible waste processed during a reporting period, in tonnes, is worked out using the formula (equation 5):
where:
WMW means the quantity of waste mix type w present in the eligible waste processed during the reporting period, in tonnes.
QMSW means the quantity of the eligible waste that is municipal solid waste, in tonnes, worked out in accordance with the monitoring requirements.
EW means the total quantity of eligible waste received during the reporting period, in tonnes, worked out using equation 7.
PW means the quantity of putrescible eligible waste processed during the reporting period, in tonnes, worked out using equation 6.
WMSW,w means the proportion of waste mix type w in the eligible waste that is municipal solid waste, worked out in accordance with subsection (2).
QC&D means the quantity of the eligible waste that is construction and demolition waste, in tonnes, worked out in accordance with the monitoring requirements.
WC&D,w means the proportion of waste mix type w in the eligible waste that is construction and demolition waste, worked out in accordance with subsection (2).
QC&I means the quantity of the eligible waste that is commercial and industrial waste, in tonnes, worked out in accordance with the monitoring requirements.
WC&I,w means the proportion of waste mix type w in the eligible waste that is commercial and industrial waste, worked out in accordance with subsection (2).
w means a waste mix type present in the eligible waste.
(2) The proportion of waste mix type w in the eligible waste that is construction and demolition waste, commercial and industrial waste or municipal solid waste (a waste stream) is:
(a) if inert waste is a waste mix type in the eligible waste—the percentage worked out for the waste mix type and waste stream under subsection 5.11(3) of the NGER (Measurement) Determination, as that subsection applies for the purposes of this paragraph (see subsection (3)); or
(b) if paragraph (a) does not apply and the licence or other authorisation that authorises the operation of the project’s AWT facility restricts the waste mix types that may be received at the facility—the percentage worked out for the waste mix type and waste stream under subsection 5.11(3) of the NGER (Measurement) Determination, as that subsection applies for the purposes of this paragraph (see subsection (4)); or
(c) if paragraphs (a) and (b) do not apply—the default percentage mentioned in paragraph 5.11(2)(c) of the NGER (Measurement) Determination for the waste mix type and waste stream.
(3) For the purposes of paragraph (2)(a), subsection 5.11(3) of the NGER (Measurement) Determination applies as if:
(a) a reference to “the landfill” were a reference to the project’s AWT facility; and
(b) a licence or other authorisation authorising the operation of the AWT facility restricted the waste mix types that may be received at the AWT facility; and
(c) inert waste were a restricted waste mix type; and
(d) each waste mix type other than inert waste were an unrestricted waste mix type; and
(e) the maximum permitted tonnage of inert waste received at the AWT facility were zero.
(4) For the purposes of paragraph (2)(b), subsection 5.11(3) of the NGER (Measurement) Determination applies as if a reference to “the landfill” were a reference to the project’s AWT facility.
25 Quantity of putrescible eligible waste
(1) Subject to subsection (2), the quantity of putrescible eligible waste processed during a reporting period, in tonnes, is worked out using the formula (equation 6):
where:
PW means the quantity of putrescible eligible waste processed during the reporting period, in tonnes.
EW means the total quantity of eligible waste received during the reporting period, in tonnes, worked out using equation 7.
QRW means the quantity of residual waste disposed of during the reporting period, in tonnes, worked out in accordance with the monitoring requirements.
QNBP means the quantity of non‑biobased products manufactured during the reporting period, in tonnes, worked out in accordance with the monitoring requirements.
HW means the historic quantity of putrescible eligible waste for the reporting period, in tonnes, worked out in accordance with section 27.
(2) If the amount worked out under subsection (1) is less than zero, the quantity of putrescible eligible waste processed during the reporting period is taken to be zero.
26 Total quantity of eligible waste received
The total quantity of eligible waste received during a reporting period, in tonnes, is worked out using the formula (equation 7):
where:
EW means the total quantity of eligible waste received during the reporting period, in tonnes.
QMSW means the quantity of the eligible waste that is municipal solid waste, in tonnes, worked out in accordance with the monitoring requirements.
QC&I means the quantity of the eligible waste that is commercial and industrial waste, in tonnes, worked out in accordance with the monitoring requirements.
QC&D means the quantity of the eligible waste that is construction and demolition waste, in tonnes, worked out in accordance with the monitoring requirements.
27 Historic quantity of putrescible eligible waste
Quantity for new projects and transitioning projects
(1) For a new project or a transitioning project, the historic quantity of putrescible eligible waste for a reporting period is zero.
Quantity for expansion projects
(2) For an expansion project, the historic quantity of putrescible eligible waste for a reporting period is worked out by adjusting the historic quantity of putrescible eligible waste for the relevant 24‑month period on a pro rata basis by reference to the length of the reporting period.
Note: This means that if, for example, the length of the reporting period is 6 months, the historic quantity of putrescible eligible waste for the reporting period is worked out by multiplying the historic quantity of putrescible eligible waste for the relevant 24‑month period by 6/24.
(3) The historic quantity of putrescible eligible waste for the relevant 24‑month period, in tonnes, is worked out using the formula (equation 8):
where:
HW means the historic quantity of putrescible eligible waste for the relevant 24‑month period, in tonnes.
HQEW means the quantity of eligible waste received by the project’s AWT facility in the relevant 24‑month period, in tonnes, worked using appropriate evidence.
HQRW means the quantity of residual waste disposed of by the project’s AWT facility during the relevant 24‑month period, in tonnes, worked using appropriate evidence.
HQNBP means the quantity of non‑biobased products manufactured by the project’s AWT facility during the relevant 24‑month period, in tonnes, worked using appropriate evidence.
Note: To be an eligible offsets project, the application made under section 22 of the Act in relation to an expansion project must be accompanied by appropriate evidence that is sufficient to calculate the historic quantity of putrescible eligible waste for the relevant 24‑month period using equation 8 (see subsection 12(2)).
(4) In this section:
appropriate evidence means:
(a) weighbridge evidence from an accepted industry weighbridge that meets appropriate measuring requirements; or
(b) waste transport contracts and invoices that provide evidence of relevant quantities of transported waste.
relevant 24‑month period, for a project, means the 24‑month period ending on the day before an application under section 22 of the Act is made in relation to the project.
Subdivision C—Calculations relating to project emissions
The project emissions for a reporting period are the emissions that result from carrying out the project during the reporting period.
The project emissions for a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 9):
where:
EP means the project emissions, in tonnes CO2‑e.
PW means the quantity of putrescible eligible waste processed during the reporting period, in tonnes, worked out using equation 6.
EW means the total quantity of eligible waste received during the reporting period, in tonnes, worked out using equation 7.
EF means the emissions from fuel used during the reporting period, in tonnes CO2‑e, worked out using equation 10.
EEP means the emissions from purchased electricity used during the reporting period, in tonnes CO2‑e, worked out using equation 11.
EPW means the emissions from the processing of putrescible eligible waste during the reporting period, in tonnes CO2‑e, worked out using equation 12.
The emissions from fuel used during a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 10):
where:
EF means the emissions from fuel used during the reporting period, in tonnes CO2‑e.
QF,i means the quantity of fuel type i used during the reporting period, worked out in accordance with the monitoring requirements.
ECi means:
(a) if QF,i is measured in gigajoules—1; or
(b) otherwise—the energy content factor, in gigajoules per tonne, gigajoules per kilolitre or gigajoules per cubic metre, mentioned in Part 1, 2 or 3 of Schedule 1 to the NGER (Measurement) Determination for fuel type i.
EFij means the emission factor, in kilograms CO2‑e per gigajoule, mentioned in Part 1, 2 or 3 of Schedule 1 to the NGER (Measurement) Determination for greenhouse gas type j and fuel type i.
i means a fuel type, other than biogas generated by the project.
j means a greenhouse gas type, being carbon dioxide, methane or nitrous oxide.
31 Emissions from purchased electricity
(1) The emissions from purchased electricity used during a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 11):
where:
EEP means the emissions from purchased electricity used during the reporting period, in tonnes CO2‑e.
QEP means the quantity of electricity purchased during the reporting period, in kilowatt hours, worked out in accordance with the monitoring requirements.
EFEP means:
(a) for electricity obtained from an electricity grid that is a grid in relation to which the NGA Factors document in force on the relevant day includes an emissions factor—that factor, in kilograms CO2‑e per kilowatt hour; or
(b) for electricity obtained from an electricity grid not covered by paragraph (a) or from a source other than an electricity grid:
(i) if the supplier of the electricity is able to provide an emissions factor that reflects the emissions intensity of the electricity (worked out in accordance with subsection (2)) and is applicable on the relevant day—that factor, in kilograms CO2‑e per kilowatt hour; or
(ii) otherwise—the emissions factor, in kilograms CO2‑e per kilowatt hour, for off‑grid electricity included in the NGA Factors document in force on the relevant day.
(2) For subparagraph (b)(i) of the definition of EFEP in subsection (1), the emissions factor must be worked out:
(a) on a sent‑out basis; and
(b) using a measurement or estimation approach that is consistent with the NGER (Measurement) Determination.
(3) Section 8 does not apply to the parameter EFEP.
(4) In this section:
NGA Factors document means the document entitled “National Greenhouse Accounts Factors”, published by the Department and as in force from time to time.
relevant day means:
(a) for a new project or an expansion project—the day the project is declared to be an eligible offsets project; or
(b) for a transitioning project—the day the first new version of the NGA Factors document that is published after the ERF commencement day comes into force.
32 Emissions from the processing of eligible waste
The emissions from the processing of putrescible eligible waste during a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 12):
where:
EPW means the emissions from the processing of putrescible eligible waste during the reporting period, in tonnes CO2‑e.
PW means the quantity of putrescible eligible waste processed during the reporting period, in tonnes, worked out using equation 6.
TPW means the total quantity of putrescible waste processed during the reporting period, in tonnes, worked out using equation 13.
ECompost means the emissions from composting processes used during the reporting period, in tonnes CO2‑e, worked out in accordance with section 34.
EAD means the emissions from anaerobic digesters used during the reporting period, in tonnes CO2‑e, worked out using equation 16.
ECom means the emissions from combustion devices used during the reporting period, in tonnes CO2‑e, worked out using equation 20.
33 Total quantity of putrescible waste
The total quantity of putrescible waste processed during the reporting period, in tonnes, is worked out using the formula (equation 13):
where:
TPW means the total quantity of putrescible waste processed during the reporting period, in tonnes.
QTW means the total quantity of waste received during the reporting period, in tonnes, worked out in accordance with the monitoring requirements.
QRW means the quantity of residual waste disposed of during the reporting period, in tonnes, worked out in accordance with the monitoring requirements.
QNBP means the quantity of non‑biobased products manufactured during the reporting period, in tonnes, worked out in accordance with the monitoring requirements.
34 Emissions from composting processes
(1) The emissions from composting processes used during a reporting period, in tonnes CO2‑e, are worked out using:
(a) if enclosed composting technology used during the reporting period includes open windrow composting—sub‑method 1 (see subsection (6)); or
(b) if enclosed composting technology used during the reporting period does not include open windrow composting—subject to subsections (2) to (5) and section 46, either:
(i) sub‑method 1 (see subsection (6)); or
(ii) sub‑method 2 (see subsection (7)).
Note 1: Sub‑method 1 uses default emissions factors to calculate emissions and sub‑method 2 uses direct measurement to calculate emissions.
Note 2: If, under subsection (5), sub‑method 2 must be used to calculate the emissions but the project proponent fails to monitor the parameter DMCompost,j as required by the monitoring requirements, the emissions are to be worked out in accordance with section 46 (see section 46).
(2) If sub‑method 1 is used to work out the emissions of methane for a reporting period, that sub‑method must also be used to calculate the emissions of nitrous oxide for the reporting period.
(3) Sub‑method 2 may only be used to work out the emissions for a reporting period if the parameter DMCompost,j is monitored as required by section 45 during the reporting period.
(4) If sub‑method 2 is used to work out the emissions of nitrous oxide for a reporting period, that sub‑method must also be used to work out the emissions of methane for the reporting period.
(5) If sub‑method 2 is used to work out the emissions of a greenhouse gas type (whether methane or nitrous oxide) for a reporting period, that sub‑method must be used to calculate the emissions of that greenhouse gas type for all subsequent reporting periods.
Sub‑method 1
(6) The emissions from composting processes used during the reporting period, in tonnes CO2‑e, are worked out using the formula (equation 14):
where:
ECompost means the emissions from composting processes used during the reporting period, in tonnes CO2‑e, being methane or nitrous oxide.
QCompost means the quantity of waste composted during the reporting period, in tonnes, worked out in accordance with the monitoring requirements.
EFCompost,j means the emissions factor, in tonnes CO2‑e, mentioned in subsection 5.22(2) of the NGER (Measurement) Determination for greenhouse gas j and the composting process.
RECompost means:
(a) if a biofilter is used to filter emissions from the composting processes before release to the atmosphere—10%; or
(b) otherwise—0.
j means a greenhouse gas type, being methane or nitrous oxide.
Sub‑method 2
(7) The emissions from composting processes used during the reporting period, in tonnes CO2‑e, are worked out using the formula (equation 15):
where:
ECompost means the emissions from composting processes used during the reporting period, in tonnes CO2‑e, being methane or nitrous oxide.
DMCompost,j means the direct measurement emissions from composting processes used during the reporting period, in tonnes CO2‑e, worked out in accordance with the monitoring requirements.
RECompost means:
(a) if a biofilter is used to filter emissions from the composting processes before release to the atmosphere—10%; or
(b) otherwise—0.
j means a greenhouse gas type, being methane or nitrous oxide.
35 Emissions from anaerobic digesters
The emissions from an anaerobic digester used during a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 16):
where:
EAD means the emissions from an anaerobic digester used during the reporting period, in tonnes CO2‑e.
γ means the factor, mentioned in subsection 5.4(1) of the NGER (Measurement) Determination, that converts cubic metres of methane to tonnes CO2‑e at standard conditions.
CE means 0.98, being the biogas collection efficiency of an anaerobic digester.
MSent,h means the volume of methane sent to combustion device h, in cubic metres, worked out in accordance with section 36.
MVent,q means the volume of methane vented due to major venting event q, in cubic metres, worked out using equation 19.
h means a combustion device used during the reporting period.
q means a major venting event associated with the anaerobic digester.
36 Volume of methane sent to a combustion device
(1) The volume of methane sent to a combustion device during a reporting period, in cubic metres, is worked out using:
(a) for a combustion device that is not an internal combustion engine—sub‑method 1 (see subsection (2)); or
(b) for a combustion device that is an internal combustion engine—either:
(i) sub‑method 1 (see subsection (2)); or
(ii) sub‑method 2 (see subsection (3)).
Note: Sub‑method 1 uses the volume of biogas sent to a combustion device and sub‑method 2 uses the electricity produced by an internal combustion engine.
Sub‑method 1
(2) The volume of methane sent to a combustion device during the reporting period, in cubic metres, is worked out using the formula (equation 17):
where:
MSent,h means the volume of methane sent to combustion device h, in cubic metres.
QBG,h means the volume of biogas sent to combustion device h, in cubic metres, worked out in accordance with the monitoring requirements.
WBG,CH4 means:
(a) if this parameter is, or is required to be, monitored continuously—the fraction worked out in accordance with the monitoring requirements; or
(b) otherwise—the fraction mentioned in subsection 5.37(2) of the NGER (Measurement) Determination.
h means:
(a) a combustion device used during the reporting period; or
(b) if a single pipe is used to send methane to more than one combustion device during the reporting period and the combustion devices are of the same kind—all of those devices.
Sub‑method 2
(3) The volume of methane sent to an internal combustion engine during the reporting period, in cubic metres, is worked out using the formula (equation 18):
where:
MSent,h means the volume of methane sent to internal combustion engine h, in cubic metres.
QEG,h means the quantity of electricity generated by internal combustion engine h (whether supplied to the grid or used on‑site), in megawatt hours, worked out in accordance with the monitoring requirements.
FMWh→GJ means 3.6, being the factor to convert megawatt hours to gigajoules.
EEh means:
(a) the factor for the electrical efficiency of internal combustion engine h determined in accordance with:
(i) the manufacturer’s specifications for the combustion of biogas; and
(ii) if the specifications set out a range of such efficiencies—the highest of those efficiencies; or
(b) if no such factor can be determined in accordance with the manufacturer’s specifications—36%.
ECBG means the energy content factor, in gigajoules per cubic metre, mentioned in Part 2 of Schedule 1 to the NGER (Measurement) Determination for sludge biogas that is captured for combustion (methane only).
h means:
(a) an internal combustion engine used during the reporting period; or
(b) if a single pipe is used to send methane to more than one internal combustion engine during the reporting period and those engines have the same electrical efficiency—all of those engines.
37 Volume of methane vented due to a major venting event
If a major venting event associated with an anaerobic digester occurs during a reporting period, the volume of methane vented due to the major venting event, in cubic metres, is worked out using the formula (equation 19):
where:
MVent,q means the volume of methane vented due to major venting event q, in cubic metres.
MSBCS means the maximum biogas storage capacity of the anaerobic digester, in cubic metres, worked out in accordance with the monitoring requirements.
FRq means the average total daily flow of biogas from the anaerobic digester for the 7 days before major venting event q, in cubic metres per day, worked out in accordance with the monitoring requirements.
tq means the number of days for all or part of which major venting event q is uncontrolled, worked out in accordance with the monitoring requirements.
WBG,CH4 means:
(a) if this parameter is, or is required to be, monitored continuously—the fraction worked out in accordance with the monitoring requirements; or
(b) otherwise—the fraction mentioned in subsection 5.37(2) of the NGER (Measurement) Determination.
q means a major venting event associated with the anaerobic digester.
38 Emissions from combustion devices
The emissions from combustion devices used during a reporting period, in tonnes CO2‑e, are worked out using the formula (equation 20):
where:
ECom means the emissions from combustion devices used during the reporting period, in tonnes CO2‑e.
MSent,h means the volume of methane sent to combustion device h, in cubic metres, worked out in accordance with section 36.
ECBG means the energy content factor, in gigajoules per cubic metre, mentioned in Part 2 of Schedule 1 to the NGER (Measurement) Determination for sludge biogas that is captured for combustion (methane only).
EFj means the emission factor, in kilograms of CO2‑e per gigajoule, mentioned in Part 2 of Schedule 1 to the NGER (Measurement) Determination for greenhouse gas type j and sludge biogas that is captured for combustion (methane only).
h means a combustion device used during the reporting period.
j means a greenhouse gas type, being methane or nitrous oxide.
Division 4—Method for calculating legacy abatement portions
Legacy abatement portions are only relevant for transitioning projects.
The legacy abatement portions are worked out by dividing into 3 equal portions the abatement resulting from the transitioning project’s activities before this determination becomes the applicable methodology determination for the project. Legacy abatement portions only include abatement that has not been reflected in unit entitlement specified in a certificate of entitlement for the project.
The legacy abatement portions are used to calculate the carbon dioxide equivalent net abatement amount for the first reporting period for the project and subsequent reporting periods as the portions accrue.
Legacy abatement portions for a transitioning project are worked out once, during the first reporting period for the project.
41 Calculation and accrual of legacy abatement portions
(1) The legacy abatement portions for a transitioning project, in tonnes CO2‑e, are worked out using the formula (equation 21):
where:
ACFI,y means legacy abatement portion ACFI,1, ACFI,2 or ACFI,3, in tonnes CO2‑e.
ACFI,N means the carbon dioxide equivalent net abatement amount, in tonnes CO2‑e, that was:
(a) the carbon dioxide equivalent net abatement amount for the project in relation to the reporting period that started when the declaration of the project as an eligible offsets project under section 27 of the Act took effect; and
(b) worked out under the applicable equation for the project that was in force for the purposes of calculating that amount for that reporting period.
ACFI,C means the amount that is the sum of the number of unit entitlement specified in each certificate of entitlement issued in respect of the project for each reporting period that ended before this determination became the applicable methodology determination for the project, in tonnes CO2‑e.
Note 1: ACFI,N will generally be the carbon dioxide equivalent net abatement amount included in the offsets report about the project for the reporting period that started when the declaration of the project as an eligible offsets project under section 27 of the Act took effect.
Note 2: The result of subtracting ACFI,C from ACFI,N is divided by 3 because this is the number of years remaining, after 1 July 2014, in the 7‑year period that started on 1 July 2010.
(2) The legacy abatement portions accrue as follows:
(a) ACFI,1 accrues 1 year after the start of the first reporting period for the project;
(b) ACFI,2 accrues 2 years after the start of the first reporting period for the project;
(c) ACFI,3 accrues 3 years after the start of the first reporting period for the project.
(3) Section 8 does not apply to a calculation under this section.
(4) In this section:
applicable equation, for a transitioning project in relation to a reporting period, means:
(a) if the Carbon Credits (Carbon Farming Initiative) (Avoided Emissions from Diverting Legacy Waste from Landfill for Process Engineered Fuel Manufacture) Methodology Determination 2012 was the applicable methodology determination for the project during the reporting period—equation 9 of that determination; or
(b) if the Carbon Credits (Carbon Farming Initiative) (Avoided Emissions from Diverting Legacy Waste through a Composting Alternative Waste Technology) Methodology Determination 2013 was the applicable methodology determination for the project during the reporting period—equation 11 of that determination; or
(c) if the Carbon Credits (Carbon Farming Initiative) (Diversion of Legacy Waste to an Alternative Waste Treatment Facility) Methodology Determination 2013 was the applicable methodology determination for the project during the reporting period—equation 15 of that determination; or
(d) if the Carbon Credits (Carbon Farming Initiative) (Enclosed Mechanical Processing and Composting Alternative Waste Treatment) Methodology Determination 2013 was the applicable methodology determination for the project during the reporting period—equation 11 of that determination.
Part 5—Reporting, record‑keeping and monitoring requirements
Note: Other reporting, record‑keeping and monitoring requirements are set out in regulations and rules made under the Act.
Division 1—Offsets report requirements
For paragraph 106(3)(a) of the Act, this Division sets out information that must be included in an offsets report about an AWT project that is an eligible offsets project.
43 Determination of certain factors and parameters
(1) If, in the circumstances described in paragraph 8(2)(b), a factor or parameter is defined or calculated for a reporting period by reference to an instrument or writing as in force from time to time, the offsets report about the project for the reporting period must include the following information for the factor or parameter:
(a) the versions of the instrument or writing used;
(b) the start and end dates of each use;
(c) the reasons why it was not possible to define or calculate the factor or parameter by reference to the instrument or writing as in force at the end of the reporting period.
(2) If a parameter is determined under section 46 for the purpose of working out the activity abatement portions for an AWT project for a reporting period, the offsets report about the project for the reporting period must include the following information for the parameter:
(a) the name of the parameter;
(b) the start and end of the non‑monitored period for which the parameter was determined;
(c) the reasons why the project proponent failed to monitor the parameter as required by the monitoring requirements;
(d) either:
(i) if the parameter is DMCompost,j—the value of the parameter ECompost and how that value was determined; or
(ii) otherwise—the value of the parameter and how that value was determined.
Division 2—Monitoring requirements
For paragraph 106(3)(d) of the Act, this Division sets out:
(a) requirements to monitor an AWT project that is an eligible offsets project (see section 45); and
(b) certain consequences if the project proponent fails to monitor the project as required (see section 46).
45 Requirements to monitor certain parameters
(1) The project proponent for an AWT project must monitor and determine a parameter set out in an item of the following table in accordance with the instructions in the item.
Monitored parameters | |||||
| Parameter | Description | Unit | Measurement procedure (including frequency as required) | Determination of parameter from measurements |
1 | DMCompost,j | Direct measurement emissions from composting processes | t | If monitored continuously, measured in a manner that is consistent with Part 1.3 of the NGER (Measurement) Determination. Frequency—if sub‑method 2 must be used to calculate ECompost under subsection 34(5), continuous | Cumulative value for the reporting period |
2 | FRq | Average total daily flow of biogas from an anaerobic digester for the 7 days before a major venting event | m3/day | Calculated from QBG,h, as monitored in accordance with item 4 of this table | For each major venting event |
3 | MSBCS | Maximum biogas storage capacity of anaerobic digesters | m3 | Either: (a) measured directly; or (b) calculated using the manufacturer’s specifications for the anaerobic digesters | At the following times: (a) when the anaerobic digesters are installed; (b) when the anaerobic digesters are upgraded in a way that changes the storage capacity |
4 | QBG,h | Volume of biogas sent to combustion devices | m3 | Estimated in accordance with Division 2.3.6 of the NGER (Measurement) Determination. Frequency—continuous | If WBG,CH4 is monitored continuously, the cumulative value for the time interval used to determine WBG,CH4 for equation 17. Otherwise, the cumulative value for the reporting period |
5 | QC&D | Quantity of eligible waste that is construction and demolition waste | t | Measured using an accepted industry weighbridge that meets appropriate measuring requirements. Frequency—for each load of eligible waste delivered to the AWT facility | Cumulative value for the reporting period |
6 | QC&I | Quantity of eligible waste that is commercial and industrial waste | t | Measured using an accepted industry weighbridge that meets appropriate measuring requirements. Frequency—for each load of eligible waste delivered to the AWT facility | Cumulative value for the reporting period |
7 | QCompost | Quantity of waste composted | t | Measured using an accepted industry weighbridge that meets appropriate measuring requirements. Frequency—for each load of compost produced | Cumulative value for the reporting period |
8 | QEG,h | Quantity of electricity generated by internal combustion engines (whether supplied to the grid or used on‑site) | MWh | Estimated in accordance with Part 6.1 of the NGER (Measurement) Determination. Frequency—continuous | Cumulative value for the reporting period |
9 | QEP | Quantity of electricity purchased | kWh or GJ | Evidenced by invoices, contractual arrangements or industry metering records. If QEP is measured in gigajoules, the quantity of kilowatt hours must be calculated by dividing the amount of gigajoules by the conversion factor of 0.0036. Frequency—continuous | Cumulative value for the reporting period |
10 | QF,i | Quantity of each fuel type used | Either: (a) t (for solid fuel); or (b) m3(for gas fuel); or (c) kL (for liquid fuel); or (d) GJ | Either: (a) monitored in accordance with section 2.25, 2.36 or Division 2.4.6 of the NGER (Measurement) Determination (as applicable to the fuel type); or (b) evidenced by invoices, contractual arrangements or industry metering records. Frequency—continuous | Cumulative value for the reporting period |
11 | QMSW | Quantity of eligible waste that is municipal solid waste | t | Measured using an accepted industry weighbridge that meets appropriate measuring requirements. Frequency—for each load of eligible waste delivered to the AWT facility | Cumulative value for the reporting period |
12 | QNBP | Quantity of non‑biobased products manufactured | t | Measured using an accepted industry weighbridge that meets appropriate measuring requirements. Frequency—for each load of non‑biobased products manufactured | Cumulative value for the reporting period
|
13 | QRW | Quantity of residual waste disposed of | t | Measured using an accepted industry weighbridge that meets appropriate measuring requirements. Frequency—for each load of residual waste disposed of | Cumulative value for the reporting period |
14 | QTW | Quantity of waste received | t | Measured using an accepted industry weighbridge that meets appropriate measuring requirements. Frequency—for each load of waste delivered to the AWT facility | Cumulative value for the reporting period |
15 | tq | Number of days for all or part of which a major venting event is uncontrolled | Whole days |
| For each major venting event |
16 | WBG,CH4 | Fraction of the volume of biogas sent to combustion devices that is methane | Fraction | If monitored continuously, estimated in accordance with Division 2.3.6 of the NGER (Measurement) Determination. Frequency—subject to subsection (2), continuously or not at all | If monitored continuously: (a) for equation 17, the average value for a time interval not greater than 1 hour must be paired to measurements of QBG,h for the same time interval; and (b) for equation 19, the average value for the period of 7 days before a major venting event |
(2) If the project proponent decides to monitor parameter WBG,CH4 continuously, the project proponent must monitor the parameter at that frequency for the remainder of the project.
Note 1: If the project proponent initially decides not to monitor the parameter continuously, the project proponent may subsequently decide to monitor the parameter continuously. However, once the project proponent decides to monitor the parameter continuously, that is how the parameter must be monitored.
Note 2: If the project proponent initially decides not to monitor the parameter continuously, the fraction mentioned in subsection 5.37(2) of the NGER (Measurement) Determination is used for the purposes of equations 17 and 19. However, if the project proponent initially or subsequently decides to monitor the parameter continuously and then, during a reporting period, fails to do so, the parameter is determined in accordance with section 46 of this determination.
(3) Any equipment or device used to monitor a parameter must be calibrated by an accredited third party technician at intervals, and using methods, that are in accordance with the manufacturer’s specifications.
(4) In this section:
appropriate measuring requirements, in relation to a measurement or estimate, means requirements that are consistent with:
(a) requirements that apply in relation to similar measurements or estimates under the NGER (Measurement) Determination; or
(b) relevant standards and other requirements under the National Measurement Act 1960.
46 Consequences of not meeting requirement to monitor certain parameters
(1) If, during a particular period (the non‑monitored period) in a reporting period, a project proponent for an AWT project fails to monitor a parameter as required by the monitoring requirements, the value of the parameter for the purpose of working out the activity abatement portions for the reporting period is to be determined for the non‑monitored period in accordance with the following table.
Consequence of not meeting requirement to monitor certain parameters | ||
Item | Parameter | Determination of parameter for non‑monitored period |
1 | WBG,CH4 (see subsection 36(2) and section 37) | The parameter is: (a) for any cumulative period of up to 3 months in any 12 months of a crediting period for the project—the amount set out in section 5.14C of the NGER (Measurement) Determination multiplied by 1.1; and (b) for any period in excess of that 3 months—the amount set out in section 5.14C of the NGER (Measurement) Determination multiplied by 1.5 |
2 | Each of the following: (a) FRq (see section 37); (b) QBG,h (see subsection 36(2)); (c) QCompost (see subsection 34(6)); (d) QEG,h (see subsection 36(3)); (e) QEP (see subsection 31(1)); (f) QF,i (see section 30); (g) tq (see section 37) | The project proponent must make a conservative estimate of the parameter having regard to: (a) any relevant measurement or estimation approaches or requirements that apply to the parameter under the NGER (Measurement) Determination; and (b) any relevant historical data for the project; and (c) any other data for the project that relates to the parameter; and (d) any other matter the project proponent considers relevant |
(2) If, during the non‑monitored period, the project proponent fails to monitor parameter DMCompost,j as required by the monitoring requirements, the emissions (ECompost) from enclosed composting technology used during the non‑monitored period, in tonnes CO2‑e, are worked out as follows:
(a) for any cumulative period of up to 3 months in any 12 months of a crediting period for the project—using sub‑method 1 in subsection 34(6), but multiplying the parameter EFCompost,j by 1.1; and
(b) for any period in excess of that 3 months—using sub‑method 1 in subsection 34(6), but multiplying the parameter EFCompost,j by 1.5.
(3) To avoid doubt, this section does not prevent the Regulator from taking action under the Act, or regulations or rules made under the Act, in relation to the project proponent’s failure to monitor a parameter as required by the monitoring requirements.
Note: Examples of action that may be taken include the following:
(a) if the failure constitutes a breach of a civil penalty provision in section 194 of the Act (which deals with project monitoring requirements), the Regulator may apply for a civil penalty order in respect of the breach;
(b) if false or misleading information was given to the Regulator in relation to the failure, the Regulator may revoke the project’s section 27 declaration under regulations or rules made for the purposes of section 38 of the Act;
(c) if the giving of false or misleading information in relation to the failure led to the issue of Australian carbon credit units, the Regulator may require all or some of those units to be relinquished under section 88 of the Act.