Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 2) 2020
I, Penny Sirault, GEMS Regulator, acting in accordance with my powers under subsection 8 (1) of the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012, make this Instrument for the purpose of specifying the fees payable in relation to applications under section 41 of the Greenhouse and Energy Minimum Standards Act 2012.
Penny Sirault
GEMS Regulator
Dated 18 December 2020
Part 1 Preliminary
This Instrument is the Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 2) 2020.
This Instrument commences on the day after it is registered.
3 Revocation
This Instrument revokes the Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2020.
4 Object
The object of this Instrument is to specify, for the purposes of subsection 8 (1) of the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012, the fees payable in relation to applications under section 41 of the Greenhouse and Energy Minimum Standards Act 2012 to register models of GEMS products.
(1) Unless the contrary intention appears words and expressions used in this Instrument have the same meaning as given in the Greenhouse and Energy Minimum Standards Act 2012 and the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012.
(2) The descriptions in column 4 of Schedule 1 are a generic description of the products covered by the GEMS Determinations listed in column 3 of Schedule 1. They are provided for ease of reference only. Whether a model is covered by a GEMS Determination is determined by the relevant GEMS determination listed in column 3 of Schedule 1.
Part 2 Fees
6 Fees
Column 2 of Schedule 1 sets out the registration fees specified for registration applications in relation to models of GEMS products covered by the GEMS determinations listed in column 3 of Schedule 1.
Schedule 1: Fees payable
(section 5)
Column 1 | Column 2 | Column 3 | Column 4 |
1 | $440 |
|
|
2 | $540 | 14. Greenhouse and Energy Minimum Standards (Electric Water Heaters) Determination 2012 | 14. Electric Water Heaters |
3 | $670 | 15. Greenhouse and Energy Minimum Standards (Gas Water Heaters) Determination 2017 16. Greenhouse and Energy Minimum Standards (Air Conditioners up to 65kW) Determination 2019 17. Greenhouse and Energy Minimum Standards (Air Conditioners above 65kW) Determination 2020 18. Greenhouse and Energy Minimum Standards (Three Phase Cage Induction Motors) Determination 2019 19. Greenhouse and Energy Minimum Standards (Household Refrigerating Appliances) Determination 2012 20. Greenhouse and Energy Minimum Standards (Household Refrigerating Appliances) Determination 2019 | 15. Gas Water Heaters 16. Residential and small commercial air conditioners 17. Large commercial air conditioners 18. Electric motors 19. Refrigerators 20. Refrigerators |
4 | $780 | 21. Greenhouse and Energy Minimum Standards (Liquid-Chilling Packages Using the Vapour Compression Cycle) Determination 2012 22. Greenhouse and Energy Minimum Standards (Close Control Air Conditioners) Determination 2012 23. Greenhouse and Energy Minimum Standards (Refrigerated Cabinets) Determination 2020 24. Greenhouse and Energy Minimum Standards (Refrigerated Display Cabinets) Determination 2012 25. Greenhouse and Energy Minimum Standards (Power Transformers) Determination 2012 | 21. Chiller Towers 22. Close Control Air Conditioners 23. Commercial Refrigerated Display/Storage Cabinets 24. Commercial Refrigerators/Display Cabinets 25. Distribution Transformers |